Minutes · Sep 2, 2026
September 2, 2026 Planning Board Regular Meeting Minutes
c1f7e5511657d93034ad90221a54ba2efb11fc0bf13267113440e8e4f5b73af7Indexed text · page 27
Show all pages- Mr. Cote stated that the revised total would be 597 replacement trees, nearly double the number of trees being removed. He emphasized that the majority of the replacement trees would be approximately 4 inches in diameter. - Mr. Cote stated that the project was not simply removing approximately 300 trees and leaving the land barren. He explained that the replacement plan reflected the substantial requirements of the Township's ordinance and would provide significant new tree planting throughout the property. PROFESSIONAL QUESTIONS +'eMs: Apte asked: Mr. Moronski to clarify the two requested waivers, one involving the removalofitrees-on'slopes of 10% or greater and the other involving the lighting rty Uncillumination-level atthe Eagle Rock Avenue property line. Mr. Moronski explained that i othe lighting issue ‘concernedithe maximum illumination level at the property line and the County'street lighting located within the right-of-way. He stated that the roadway lighting was designed to meet County standards. =tirMsApte referred toithe: proposed lighting fixture mounting height of 27 feet and asked whether:the 3:5+foot-candle illumination level at the property line resulted from the ‘ County-related intersection lighting. Mr. Cote explained that the lighting was intended to properly illuminaté:the! driveway and the intersection. He stated that the applicant was | Juneértaii» whether the illumination requirement would fall under County or Township f jurisdiction and had conservatively requested relief. sMs: Apte asked whether the Al and A2 lighting fixtures shown on the plans were located i \nwjthinrthe: applicant's property. Mr. Cote confirmed that they were and stated that their purpose was to illuminate the driveway. | the ign Ms. Apte:stated that! the applicant should request the lighting waiver because the yndlumination 'standardis' contained in the Township ordinance. She explained that the testimoiy.supporting the waiver would be the need for adequate driveway safety and vlighting at thelintersection: Mr. Cote confirmed that he had included that justification toward the end of his earlier testimony. , =» Msi Apte:asked’Mr. Moronski whether his testimony was that the increased foot-candle Loroi level-was necessary for driveway safety. Mr. Moronski confirmed that it was. PROFESSIONAL COMMENTS - Ms. Apte stated that the application involved
testimony was that the increased foot-candle Loroi level-was necessary for driveway safety. Mr. Moronski confirmed that it was. PROFESSIONAL COMMENTS - Ms. Apte stated that the application involved approximately four larger C variances, including the steep slope-related variances, and explained that the Board needed to consider the distinction between C1 hardship variances and C2 variances. - Ms. Apte stated that Mr. Moronski had grouped the steep slope variances together as C1 hardship variances because they were related to the property's topographic conditions. o Ms. Apte explained that the requested steep slope relief included disturbance within steep slope areas and reductions in the required setbacks. She stated that for slopes between 10% and 30%, the ordinance requires a 50-foot setback, while the applicant proposed 10 feet. - Ms. Apte further stated that for slopes greater than 30%, the ordinance requires a 100- foot setback, while the applicant again proposed 10 feet. 27
File revisions (1)
- Nov 6, 2026
c1f7e551165725,244,207 bytes