Supporting Documentation · Date unavailable
225-10 Attachment
d4bfb9a199fc3b49aabcf16dec5e1580929bae8084c15883447fa424968899c0Indexed text · page 1
Show all pagesGrant Application for State Aid to Counties and Municipalities Municipal Aid 2011 MA-2011-West Orange Town Township-00220 Roadway_Preservation TYPE OF IMPROVEMENT Infrastructure Purpose Bikeway Primary project purpose is for constructing new bikeways (e.g. bike lanes, bike paths, bike compatible roadways). Bridge Preservation Primary project purpose is for improving the condition of Bridge infrastructure (e.g. new deck, rehabilitation, replacement). Mobility Primary project purpose is to enhance mobility and reduce congestion (e.g. adding lanes, park & ride, signal optimization). Pedestrian Safety Primary project purpose is to enhance pedestrian safety (e.g. new sidewalks, new crosswalks, traffic calming, pedestrian overpass). Quality of Life Primary project purpose is for beautification, environmental mitigation, economic development or historic preservation. ✔ Roadway Preservation Primary project purpose is for improving the condition of roadway infrastructure (e.g. resurfacing, reconstruction, drainage). Roadway Safety Primary project purpose is to enhance vehicular safety (e.g. guide rail, signing, warning devices, striping).
File revisions (1)
- Sep 29, 2026
d4bfb9a199fc2,260,797 bytes