Supporting Documentation · Jun 15, 2022
ZB 22 08 Flores Application Submission Package
72c717ada681c1d96ff4baf6b02460d298b3a9d407cea063452502e4c2f35865Indexed text · page 19
Show all pagesFEE SCHEDULES (iii) 25-56 APPLICATION FEES. 25-56.1 Minor Subdivision Application Fees, * Fee Escrow a Resubdivision where no new $50.00 NWA lots. are created vb. Other Base fee $100.00 “NA Plus per lot fee 25.00 (Ord. No. 2357-11 § 25-56.1) 25-56.2 Major Subdivision Application Fees, a Sketch/Plat Concept Application Base fee $100.00 NA Plus per lot fee 25.00 b. Preliminary Application Base fee $200.00 (1) Plus per lot fee 50.00 ©. Final Application Base fee $250.00 (1) . Plus per lot fee 25.00 {Ord. No. 2357-11 § 25-56.2) 25-56.3 Site Plans - Nonresidential Application Fees. a Sketch Plat/Conceptual Fee $350.00 WA b. Preliminary Application Base fee (minimum) $300.00 (1) Plus floor area fee .02/sq. ft. Plus parking space fee -50/space Plus acreage fee $50.00/acre ‘The preliminary fee shall be calculated by adding to the base fee one (1) of the three (3) zemaining sub-fees. The total fee shall represent the maximum fee possible. c. Final Application 1/2 of prelitiinary fee 0) (Ord. No. 2357-11 § 25-56.3)
File revisions (1)
- Sep 29, 2026
72c717ada6811,968,963 bytes