Supporting Documentation · Feb 1, 2023
2022 08 Drainage Report
Preserved file SHA-256
03dc830dad837ba851c1965f71e284e693db9e5783123063d42d4e9c3b805bf9Indexed text · page 160
Show all pagesq DYNAMIC ENGINEERING Overflow Spillway Calculations Project: Residential Subdivision Job #: 4266-99-001 Location: West Orange Township Computed By: RMW Checked By: RPF Date: 8/5/2022 BIORETENTION BASIN C To Size Spillway: . Assume complete blockage of the outlet control structure and no infiltration . Route 2 ,10 & 100 year storm through basin assuming that the basin is filled with water up to the Emergency Spillway Elevation 2 Year 10 Year 100 Year Spillway Width (ft.) Spillway Elevation (ft. Flow through Spillway (Q) (cfs \Water Surface Elevation (ft) Depth of Flow (ft) [Area of Flow (A) (sf) Velocity (V)=Q/A (fU’sec) 0.81 1.04 1.36 &V = < 2.0FPS & Stability Achieved
File revisions (1)
- Sep 29, 2026
03dc830dad8310,708,198 bytes