Subgrade Stabilization and Inspection: The on-site soils are considered to be extremely moisture sensitive and every effort should be made to minimize disturbance of the on-site soils by construction traffic and surface runoff. The on-site soils will likely become unsuitable if exposed to moisture and/or construction traffic. If these materials become overly wetted, the on-site soils will likely require increased handling such as discing and drying during extended periods of favorable weather and/or partial overexcavation and stabilization. A triaxle geogrid such as Tensar TX-5 of TX-7 or mixing with granular soils, may be considered where excessively soft or pumping conditions are encountered, as directed by the geotechnical engineer. The subgrades should be sealed daily and construction traffic be minimized to designated non- structural areas and following periods of precipitation as an attempt to minimize deterioration of otherwise suitable subgrade soils. Dynamic Earth should be retained as the Geotechnical Engineer of Record to inspect soil conditions during construction and verify the suitability of prepared foundation, floor slab and pavement subgrades for support of design loads. Import/On-site Structural Fill Material: Soils placed as structural fill material should consist of well graded sand or gravel with a maximum particle size of three inches in diameter and less than 15 percent of material passing the number 200 sieve. These materials should be free of objectionable debris (clay clumps, organic and/or deleterious material, etc.) and within moisture contents suitable for compaction. Alternative soil types with higher percentages of silt and clay may be considered, provided that the contractor is able to achieve proper compaction and maintain suitable subgrade once the material is placed. Fine-grained soils and/or granular soils with higher percentages of silt and clay are extremely moisture sensitive and will only be suitable for reuse as structural fill material under ideal weather conditions. Materials wetted beyond the optimum moisture content; that contain oversized rock or debris; or with increased amounts of objectionable debris will not be suitable for reuse as structural fill material without special handling. As such, the contractor should be responsible for importing structural fill material and/or processing on-site soils as

Page 15

not be suitable for reuse as structural fill material without special handling. As such, the contractor should be responsible for importing structural fill material and/or processing on-site soils as required so that these materials are suitable for structural fill placement. If encountered, cobbles, boulders and/or oversized debris greater than three inches in diameter will need to be separated from material to be placed as structural fill. Approved material between three to 12 inches in diameter may be crushed or individually placed in fill layers deeper than two feet below proposed subgrade levels. Care must be taken to individually seat any large particles and to compact soil around large particles with hand operated equipment to minimize the risk of void formation. The larger material should not be placed near areas of the proposed utility or planned excavation. Boulders larger than approximately 12 inches are not expected to be adequate for use as fill or backfill and should be removed from the site or crushed to an adequate size. The on-site soils encountered included existing fill material, natural glacial deposits, natural residual soils, and weathered rock/rock. Portions of these materials (above the zone of saturation) are preliminarily expected to be suitable for reuse as structural fill material, SHI Builders 12 4266-99-001E

File revisions (1)