Show all pagesASSOCIATES Chairman and Members of the West Orange Township Zoning Board September 13, 2022 Re: M. Vega Investments LLC (ZB-21-01) Our File No. VWRZ0134.01 Preliminary & Final Major Site Plan with ‘C’ Page 5 and ‘D’ Variances - Review #4 7. Itremains for the Applicant to submit a truck turning template to the Board to demonstrate that adequate maneuvering room is available for the trash trucks that are anticipated to use the site. In their September 1, 2022 letter, Mr. Kline and Ms. Savitz state that testimony will be provided. 8. It states on sheet C-4 that an electronic sliding gate with keypad operator is proposed at the entrance to the site. Details of the gate and the keypad operator must be added to the plans. In their September 1, 2022 letter, Mr. Kline and Ms. Savitz state that the proposed gate detail will be provided as a condition of approval. 9. It states in the previously submitted Stormwater Management Statement that the area of disturbance will be 10,352 sf and the new motor vehicle surface will be less than 0.25 acres. Since the area of disturbance will be less than 1 acre and the new motor vehicle surface will be less than 0.25 acres, the project is classified as a Minor Development. In addition, the Stormwater Management Statement demonstrates that the impervious area will be decreased by 399 sf and there will be no increase in the post-development runoff leaving the site for the 2, 10 and 100 year storms. 10. it shows on sheet C-5 that the Applicant proposes to install two (2) Type B inlets along the southerly property line to collect the runoff from the parking lot. In addition, the roof leaders from the building are to be connected to the Type B inlet closest to the street. The Applicant then proposes to install an 8” PVC pipe which will discharge to a doghouse manhole which will be installed on the existing storm sewer on the westerly side of Franklin Avenue. 11. As a condition of any approval granted by the Board, it is our recommendation that the Applicant be required to consolidate the three (3) existing lots. Prior to recording, a copy of the proposed Deed of Consolidation must be submitted to the Board for review and approval by the Board Attorney and our office. In addition, the proposed lot number for the consolidated parcel must be approved in writing by the West Orange Tax Assessor. Cc. LIGHTING COMMENTS 1. The
roval by the Board Attorney and our office. In addition, the proposed lot number for the consolidated parcel must be approved in writing by the West Orange Tax Assessor. Cc. LIGHTING COMMENTS 1. The Applicant requires a waiver from Section 25-14.2 as the proposed parking lot lighting is under the 2.0 footcandles required. However, we note that the proposed lighting meets IES (Illuminating Engineering Society) standards and appears to be sufficient as proposed. 2. It remains for the plans to be revised to provide the manufacturer's catalog cut and ordering information for the proposed light pole. Also, provide the color and finish for the proposed pole. In their September 1, 2022 letter, Mr. Kline and Ms. Savitz state that the cut sheet for the proposed light pole will be provided in advance of construction. 3. It remains for the plans to be revised to indicate timers and hours of operation for the proposed light fixtures. In their September 1, 2022 letter, Mr. Kline and Ms. Savitz state that testimony will be provided regarding the proposed hours of operation. ‘S:\West Orange\Zoning BoardiVWRZ0134.01 - M VEGA INVESTMENTS, LLC\22-09-13 Review #4 docx Ne
File revisions (1)
- Sep 29, 2026
d25d3c750f94423,654 bytes