Date: 6/14/2022 Project: Altera Development Project No: 2530-99-006 1904 Main Street, Lake Como, NJ 07719 Calculated By: SDP (732) 974-0198 Checked By: RJC Worksheet 3: Time of Concentration (T c ) Calculations Land Condition: Proposed Drainage Area: DA-1 • Sheet Flow : AB BC Woods, Light Woods, Light 1. Surface Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Underbrush Underbrush 2. Manning's Roughness Coefficient, n . . . . . . . . . . . . . . . . . . . . . . 0.4 0.4 3. Flow Length, L { total L ≤ 100 ft } . . . . . . . . . . . . . . . . . . . . . . . 50.0 ft 50.0 ft 4. Two-Year 24-hour Rainfall, p 2 for . . . Essex County .... 3.44 in 3.44 in 3.44 in 5. Land Slope, s (ft/ft) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.029 ft/ft 0.057 ft/ft 0.007 (n L ) 0.8 6. Travel Time, T t = 0.5 0.4 . . . . . . . . . . . . . . . . . . . . . . . 0.171 hr + 0.130 hr + 0.000 hr = 0.301 hr p2 s • Shallow Concentrated Flow :

Page 74

0 hr + 0.000 hr = 0.301 hr p2 s • Shallow Concentrated Flow : CD DE EF 7. Surface Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unpaved Unpaved Unpaved 8. Flow Length, L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25.0 ft 37.0 ft 20.0 ft 9. Watercourse Slope, s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.050 ft/ft 0.027 ft/ft 0.167 ft/ft 10. Average velocity, V { see Figure 3.1) . . . . . . . . . . . . . . . . . . . . . . 3.61 ft/s 2.65 ft/s 6.59 ft/s 11. Travel Time, T t = L . . . . . . . . . . . . . . . . . . . . . . . 0.002 hr + 0.004 hr + 0.001 hr = 0.007 hr 3600 V • Channel Flow : FG GH 12. Pipe Diameter, D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 in 18 in 13. Cross-Sectional Flow Area, A . . . . . . . . . . . . . . . . . . . . . . . . . 1.767 sf 1.767 sf 14. Wetted Perimeter, p w . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.7 ft 4.7 ft 15. Hydraulic Radius, r = A / p w . . . . . . . . . . . . . . . . . . . . . . . . . . 0.4 ft 0.4 ft 16. Channel Slope, s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.020 ft/ft 0.020 ft/ft 17. Pipe Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . HDPE HDPE 18. Manning's Roughness Coefficient, n . . . . . . . . . . . . . . . . . . . . . 0.010 0.010 2/3 1/2 1.49 r

Page 74

ent, n . . . . . . . . . . . . . . . . . . . . . 0.010 0.010 2/3 1/2 1.49 r s 19. Velocity, V = ..................... 10.96 ft/s 10.96 ft/s n 20. Flow Length, L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134.0 89.0 21. Travel Time, T t = L . . . . . . . . . . . . . . . . . . . . . . . . 0.003 . . . . . hr ...+ . . . 0.002 . . . hr + 0.000 hr = 0.006 hr 3600 V 22. Watershed or subarea Time of Concentration, T c { add T t in steps 6, 11 and 21 } . . . . . . . . . . . . . . . . . . . . . . . . . 0.314 hr 18.8 min

Page 75

Date: 6/14/2022 Project: Altera Project No: 2530-99-006 1904 Main Street, Lake Como, NJ 07719 Calculated By: SDP (732) 974-0198 Checked By: RJC Worksheet 3: Time of Concentration (T c ) Calculations Land Condition: Proposed Drainage Area: DA-2A DET • Sheet Flow : AB BC CD Woods, Dense Woods, Light Woods, Light 1. Surface Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Underbrush Underbrush Underbrush 2. Manning's Roughness Coefficient, n . . . . . . . . . . . . . . . . . . . . . . 0.8 0.4 0.4 3. Flow Length, L { total L ≤ 100 ft } . . . . . . . . . . . . . . . . . . . . . . . 12.0 ft 75.0 ft 13.0 ft 4. Two-Year 24-hour Rainfall, p 2 for . . .Essex County .... 3.44 in 3.44 in 3.44 in 5. Land Slope, s (ft/ft) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.333 ft/ft 0.067 ft/ft 0.154 ft/ft 0.007 (n L ) 0.8 6. Travel Time, T t = . . . . . . . . . . . . . . . . . . . . . . . 0.036 hr + 0.169 hr + 0.030 hr = 0.235 hr p 2 0.5 s 0.4 • Shallow Concentrated Flow : DE EF FG 7. Surface Description . . . . . . . . . . . . . . . . . . . . . . . . . . .

Page 75

w : DE EF FG 7. Surface Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unpaved Paved Paved 8. Flow Length, L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13.0 ft 145.0 ft 45.0 ft 9. Watercourse Slope, s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.154 ft/ft 0.076 ft/ft 0.050 ft/ft 10. Average velocity, V { see Figure 3.1) . . . . . . . . . . . . . . . . . . . . . . 6.33 ft/s 5.60 ft/s 4.55 ft/s 11. Travel Time, T t = L . . . . . . . . . . . . . . . . . . . . . . . 0.001 hr + 0.007 hr + 0.003 hr = 0.011 hr 3600 V • Channel Flow : 12. Pipe Diameter, D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13. Cross-Sectional Flow Area, A . . . . . . . . . . . . . . . . . . . . . . . . . 14. Wetted Perimeter, p w . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15. Hydraulic Radius, r = A / p w . . . . . . . . . . . . . . . . . . . . . . . . . . 16. Channel Slope, s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17. Pipe Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18. Manning's Roughness Coefficient, n . . . . . . . . . . . . . . . . . . . . . 1.49 r 2/3 s 1/2 19. Velocity, V = ..................... n 20. Flow Length, L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21. Travel Time, T t = L . . . . . . . . . . . . . . . . . . . . . . . . .0.000 . . . . .hr. . .+. . .0.000 .. hr + 0.000 hr = 0.000 hr 3600 V 22. Watershed or subarea Time of Concentration, T c { add T t in steps 6, 11 and 21 } . . . . . . . . . . . . . . . . . . . . . . . . . 0.246 hr

Page 75

000 hr 3600 V 22. Watershed or subarea Time of Concentration, T c { add T t in steps 6, 11 and 21 } . . . . . . . . . . . . . . . . . . . . . . . . . 0.246 hr 14.7 min 1

Page 76

Date: 6/14/2022 Project: Altera Project No: 2530-99-006 1904 Main Street, Lake Como, NJ 07719 Calculated By: SDP (732) 974-0198 Checked By: RJC Worksheet 3: Time of Concentration (T c ) Calculations Land Condition: Proposed Drainage Area: DA-2B DET • Sheet Flow : AB BC Woods, Light Woods, Light 1. Surface Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Underbrush Underbrush 2. Manning's Roughness Coefficient, n . . . . . . . . . . . . . . . . . . . . . . 0.4 0.4 3. Flow Length, L { total L ≤ 100 ft } . . . . . . . . . . . . . . . . . . . . . . . 12.0 ft 88.0 ft 4. Two-Year 24-hour Rainfall, p 2 for . . .Essex County .... 3.44 in 3.44 in 3.44 in 5. Land Slope, s (ft/ft) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.333 ft/ft 0.068 ft/ft 0.007 (n L ) 0.8 6. Travel Time, T t = . . . . . . . . . . . . . . . . . . . . . . . 0.021 hr + 0.191 hr + 0.000 hr = 0.211 hr p 2 0.5 s 0.4 • Shallow Concentrated Flow : CD DE EF 7. Surface Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unpaved Paved Paved 8. Flow Length, L . . . . . . . .

Page 76

EF 7. Surface Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Unpaved Paved Paved 8. Flow Length, L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45.0 ft 105.0 ft 35.0 ft 9. Watercourse Slope, s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.068 ft/ft 0.086 ft/ft 0.057 ft/ft 10. Average velocity, V { see Figure 3.1) . . . . . . . . . . . . . . . . . . . . . . 4.21 ft/s 5.95 ft/s 4.86 ft/s 11. Travel Time, T t = L . . . . . . . . . . . . . . . . . . . . . . . 0.003 hr + 0.005 hr + 0.002 hr = 0.010 hr 3600 V • Channel Flow : 12. Pipe Diameter, D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13. Cross-Sectional Flow Area, A . . . . . . . . . . . . . . . . . . . . . . . . . 14. Wetted Perimeter, p w . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15. Hydraulic Radius, r = A / p w . . . . . . . . . . . . . . . . . . . . . . . . . . 16. Channel Slope, s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17. Pipe Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18. Manning's Roughness Coefficient, n . . . . . . . . . . . . . . . . . . . . . 1.49 r 2/3 s 1/2 19. Velocity, V = ..................... n 20. Flow Length, L . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21. Travel Time, T t = L . . . . . . . . . . . . . . . . . . . . . . . . .0.000 . . . . .hr. . .+. . .0.000 .. hr + 0.000 hr = 0.000 hr 3600 V 22. Watershed or subarea Time of Concentration, T c { add T t in steps 6, 11 and 21 } . . . . . . . . . . . . . . . . . . . . . . . . . 0.221 hr

Page 76

in steps 6, 11 and 21 } . . . . . . . . . . . . . . . . . . . . . . . . . 0.221 hr 13.3 min 1

Page 77

EXISTING & PROPOSED HYDROGRAPHS 2YR, 10YR & 100YR DESIGN STORMS (HYDROGRAPHS CREATED USING HYDROLOGY STUDIO 2020 COMPUTER SOFTWARE)