Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 12, 2022

PB 22 10 CME Associates Review 1 Dated September 28 2022

Preserved file SHA-256e68392ece3b0bc20836ddddb126becfb9dc927ce8e33d943cf4fe8a3194a70ee

Indexed text · page 1

Show all pages
Page 1

JOHN H. ALLGAIR, PE, PP, LS (1983-2001) DAVID J. SAMUEL, PE, PP, CME JOHN J. STEFANI, PE, LS, PP, CME JAY B. CORNELL, PE, PP, CME MICHAEL J. McCLELLAND, PE, PP, GREGORY R. VALESI, PE, PP, CME ASSOCIATES TIM W. GILLEN, PE, PP, CME (1991-2019) BRUCE M. KOCH, PE, PP, CME LOUIS J. PLOSKONKA, PE, CME TREVOR J. TAYLOR, PE, PP, CME BEHRAM TURAN, PE, LSRP LAURA J. NEUMANN, PE, PP Date: Re: cc: From: DOUGLAS ROHMEYER, PE, CFM, CME MEMORANDUM ROBERT J. RUSSO, PE, PP, CME JOHN J. HESS, PE, PP, CME To: Chairman and Members of the West Orange Planning Board John J. Hess, PE, PP, CME Planning Board Engineer September 28, 2022 Application No. PB-22-10 Altera 769, LLC Phase 2 Final Site Plan with “C” Variances Review #1 769 Northfield Avenue Block 166.15, Lot 1.09 Our File: VWRP0166.01 Paul Grygiel, AICP, PP - Township Planning Director Leonard Lepore, PE - Township Engineer Diana McGovern, Esq. — Planning Board Attorney Altera 769, LLC - Applicant Lisa A. John-Basta, Esq. — Applicant's Attorney Robert J. Colucco IIl, PE —- Applicant’s Engineer Our office has received for review the following documents which were submitted in support of the above referenced application for Final Site Plan approval of Phase 2: A set of unsigned Phase II Final Major Site Plan drawings (15 sheets) prepared by Robert J. Colucco Ill, PE with Dynamic Engineering of Chester, New Jersey dated August 17, 2022. A set of unsigned Steep Slope Calculations drawings (2 sheets) prepared by Robert J. Colucco III, PE dated August 17, 2022. A print of an unsigned Vehicle Circulation Plan - Refuse (1 sheet) prepared by Robert J. Colucco Ill, PE dated August 17, 2022. A Stormwater Management Report prepared by Robert J. Colucco, PE and bearing a latest revision date of August 2022. A Stormwater Management Facilities Operation and Maintenance Manual prepared by Robert J. Colucco, PE and bearing a latest revision date of August 2022. A completed Application Form dated August 30, 2022 including an attachment which lists the variances that are requested and includes a Proposal and Reasons for Relief which describes the purpose of the application and sets forth the reasons why the requested relief should be granted.. ‘S:\West Orange\Planning BoardlVWRPO166 01 - Altera 769, LLC\Phase 2 Final Review #1 09-28-2022 docx QO 849 W, BAY AVENUE, SUITE 7 » BARNEGAT, NEW JERSEY 08005 « (732)

Page 1

ted relief should be granted.. ‘S:\West Orange\Planning BoardlVWRPO166 01 - Altera 769, LLC\Phase 2 Final Review #1 09-28-2022 docx QO 849 W, BAY AVENUE, SUITE 7 » BARNEGAT, NEW JERSEY 08005 « (732) 410-2660 » FAX: (609) 698-1680 a CONSULTING AND MUNICIPAL ENGINEERS

File revisions (1)