Supporting Documentation · Oct 20, 2022
CME Review 5 Dated 10 12 2022
bc4f4d73c70bd2ab5a5112fbecabcca42574ce06157513eaa7cabfcdef82f107Indexed text · page 2
Show all pagesXQ ASSOCIATES Chairman and Members of the West Orange Township Zoning Board October 12, 2022 Re: M. Vega Investments LLC (ZB-21-01) Our File No. VWRZ0134.01 Preliminary & Final Major Site Plan with ‘C’ Page 2 and ‘D’ Variances - Review #5 A September 1, 2022 letter from Joshua Kline, PE and Afton Savitz, PE to the West Orange Zoning Board of Adjustment which addresses the comments in the August 8, 2022 Memorandum from the Planning Director and our August 10, 2022 engineering review memorandum. A set of unsigned architectural plans (5 sheets) prepared by Nicolas Salerno Architect, LLC of East Hanover, New Jersey and bearing a latest revision date of July 28, 2022. A print of a Boundary & Topographic Survey (1 sheet) prepared by Thomas F. Miller, PLS with Stonefield Engineering & Design dated June 28, 2021. A set of Truck Turn Exhibits (4 sheets) prepared by Joshua H. Kline, PE and Afton Savitz, PE and bearing a latest revision date of September 1, 2022. A Stormwater Management Statement prepared by Stonefield Engineering and Design, LLC dated January 7, 2022. A Pipe Sizing analysis prepared by Stonefield Engineering & Design dated September 1, 2022. A Planning Report prepared by John McDonough, LA, PP with John McDonough Associates, LLC of Morris Plains, New Jersey dated December 22, 2020. A Traffic & Parking Assessment Report prepared by Matthew J.Z Seckler, PE, PP, PTOE with Stonefield Engineering & Design, LLC dated September 24, 2021. A Summary of Requested Relief prepared by Stonefield Engineering and Design, LLC, dated January 6, 2022. A Summary of Approvals and Permits prepared by Stonefield Engineering and Design, LLC dated January 6, 2022. A completed Application Package. An undated Proposal which describes the proposed improvements at the site and details the variances that are requested by the Applicant. A completed Site Plan / Subdivision Checklist. A completed Sustainability Checklist Form. A copy of a January 5, 2021 statement from the Office of the Tax Collector which states that the taxes on lot 75.03, block 134.02 are paid until January 31, 2021. A copy of a January 5, 2021 statement from the Office of the Tax Collector which states that the taxes on lot 79, block 134.02 are paid until January 31, 2021. S:\West OrangelZoning Board\VWWRZ0134 01 - M VEGA INVESTMENTS, LLC\22-10-12 Review #5 docx
File revisions (1)
- Sep 29, 2026
bc4f4d73c70b409,811 bytes