Supporting Documentation · Dec 15, 2022
SPRAB report ZB 22 09 89 Ashland Avenue LLC
d0c85dd05460283f1111fc8d5b225281ac608ebb45e374fef74d65583b5e865fIndexed text · page 2
Show all pagesAN EQUAL OPPORTUNITY EMPLOYER 2 www.westorange.org well. The applicant was asked whether the exterior materials of the existing building are proposed to be modified with the response being it has not yet been decided. • Fire safety: Input was requested from the West Orange Fire Department regarding any issues with the proposed site and building layout. Other questions included whether sprinklers will be required, where the nearest fire hydrant is located and whether there would be any benefit to providing balconies on the rear of the building. • Other items: The applicant’s engineer was asked whether testing has been done to determine the feasibility of an underground recharge basin on the site. Trash and recycling are proposed to be wheeled out to the curb. The applicant’s signature will need to be provided on the application. The applicant indicated its professionals will submit additional information and revised plans, as necessary, with the intention of being scheduled for an upcoming Zoning Board of Adjustment meeting.
File revisions (1)
- Sep 29, 2026
d0c85dd0546045,887 bytes