V3 RESUBMISSION Response to Township Engineers Review 1 Dated November 3 2022

Preserved file SHA-25659bc435674a0f956288f786669546da863ddaad3174adc0dfc9b5edd2a068e3d

Indexed text · page 11

Show all pages
Page 11

11 46. As stipulated in §25-29 of the Ordinance, this project is classified as a Major Development. As a result, the development shall incorporate a maintenance plan for the stormwater management measures as stipulated in §25-29.10. A copy of the maintenance plan must be submitted to the Board for review and approval. In addition, the maintenance plan and any future revisions must be recorded upon the deed of record for the property. PETRY RESPONSE: A maintenance plan is included as a part f this submittal. 47. As required by §25-29.3a, the minimum standards for groundwater recharge, stormwater quality and stormwater runoff quantity shall be met by incorporating green infrastructure. Since the property in question is located in the Metropolitan Planning Area, the Applicant is not required to address groundwater recharge. In addition, it states in §25-29.4q that stormwater runoff quality standards are only applicable when the major development results in an increase of one-quarter acre or more of regulated motor vehicle surface which this project does not. Therefore, the Applicant must demonstrate that the project meets the minimum standards for stormwater runoff quantity set forth in §25-29.4o and r. As stipulated in §25-29.4o3, the design engineer shall utilize BMPs from Table 1 or from Table 2 and/or an alternative stormwater management measure approved in accordance with §25-29.4g. PETRY RESPONSE: The soils from the site that were tested did not have adequate permeability for infiltration. (See permeability results in Stormwater Management Report Appendix). Therefore, we are requesting a waiver to allow us to not use green infrastructure. 48. The plans must be revised to include the following details: a) Depressed curb. b) Guide rail. c) Fence.* d) Screening fence.* e) EV charging station.* f) Fire hydrant. g) Wet tap. h) Thrust blocks or harnessing. i) Grease trap.* j) Emergency generator.* k) County curb, sidewalk, and trench restoration. PETRY RESPONSE: The details have been added to the plans. Please note that the pavement detail has been revised to show different sections for the loop road and the parking/aisle areas (See Sheet SP-19).

File revisions (1)