V3 RESUBMISSION Response to Township Engineers Review 1 Dated November 3 2022

Preserved file SHA-25659bc435674a0f956288f786669546da863ddaad3174adc0dfc9b5edd2a068e3d

Indexed text · page 14

Show all pages
Page 14

14 D. LIGHTING COMMENTS 1. Revise the plans to provide a three (3) foot high stanchion for all light poles within the parking areas. PETRY RESPONSE: The light pole detail has been revised to show a 3-foot stanchion for poles within the parking areas (See Sheet SP-17). 2. Revise the plans to provide the concrete strength for proposed light pole foundation details on sheet SP-17. Staff recommends a strength of 4,500 PSI. PETRY RESPONSE: The light pole foundation details will be revised to indicate a concrete strength of 4,500 PSI. 3. Revise the plans to indicate proposed timers and hours of operation. Also, indicate proposed color and finish for all fixtures and poles. PETRY RESPONSE: Testimony will be provided with regard to hours of operation. Pole and Fixture colors will be chosen during the construction. The colors will be coordinated with the building façade and dependent on availability. 4. Revise the plans to provide isolux pattern details with a scale and graph to correspond with the proposed fixtures. Also, provide the manufacturer's catalog cuts and ordering information for the proposed light poles, for further review. PETRY RESPONSE: The manufacturer catalog cut sheets are included in this submittal. The ordering information is contained in the schedule.

File revisions (1)