V3 RESUBMISSION Response to Township Engineers Review 1 Dated November 3 2022
59bc435674a0f956288f786669546da863ddaad3174adc0dfc9b5edd2a068e3dIndexed text · page 3
Show all pages3 PETRY RESPONSE: Dimensions have been added to the plans for the areas that are not typical. (See Sheet SP-3). 8. Sheet SP-3 must be revised to dimension the proposed front yard, rear yard and side yard setbacks to the proposed building. PETRY RESPONSE: These dimensions are shown on the Overall Layout Plan (See Sheet SP-2). Sheet SP-3 is not at a scale that allows all the property lines to be shown. However, we have added the setbacks where practical. 9. Sheet SP-3 must be revised to dimension the widths of the various landscape islands in the parking lot on the southerly side of the building. PETRY RESPONSE: Dimensions have been added to the plans. (See Sheet SP-3). 10. Sheet SP-3 must be revised to dimension the width of the pickup/drop off aisle under the Porte Cochere. PETRY RESPONSE: Dimensions have been added to the plans. (See Sheet SP-3). 11. Sheet SP-3 must be revised to dimension the length of the flush curb within the drop off area on the northerly side of the building. PETRY RESPONSE: Dimensions have been added to the plans. The proposed curb cut is 13 feet wide. (See Sheet SP-3). 12. Sheet SP-3 must be revised to show the radii of the proposed curbing in front of the parking spaces in Employee Lot #1. PETRY RESPONSE: Dimensions for the radii have been added to the plans. (See Sheet SP-3).
File revisions (1)
- Sep 29, 2026
59bc435674a0243,997 bytes