V3 RESUBMiSSION Stormwater Maintenance Manual

Preserved file SHA-256ca2ca904a789ee022342c5f6a3b3099a190627bebe9808d27104a70712b12a51

Indexed text · page 6

Show all pages
Page 6

(Blend of 3 cultivars) at planting rate of 3.5 lbs/1000 square feet (Appendix, Exhibit 1). Once established, inspections of vegetation (grass) health, density, and diversity shall be performed at least twice annually during both the growing and non-growing seasons. • The vegetative cover (grass mixture) should be maintained at 85 percent. If vegetation has greater than 50 percent damage, the area should be re-established by overseeding with the above-specified grass seed mixture in accordance with the original specifications contained in the project Landscape Plan and Soil Erosion and Sediment Control Plan. • All use of fertilizers, mechanical treatments, pesticides, and other means to assure optimum vegetation health must be minimized as to not compromise the intended purpose of the detention basin. All vegetation deficiencies should be addressed without the use of fertilizers and pesticides whenever possible. C. STRUCTURAL COMPONENTS • All structural components must be inspected for cracking, subsidence, spalling, erosion, and deterioration at least annually (See Appendix, Figure 1 – Stormwater Location Plan) D. OTHER MAINTENANCE PROCEDURES • The detention basins have been designed to drain in less than 72 hours as the approximate time it would normally take to completely drain the maximum design storm runoff volume (100 yr storm) from each basin. If significant increases or decreases in the normal drain time are observed, the basin’s outlet structure, underdrain system, and both groundwater and tailwater levels must be evaluated and appropriate measures taken to comply with the maximum drain time requirements and maintain the proper functioning of the basin. Below is a table relating the approximate times to drain versus inches of rainfall: Storm Event (yr.) Inches of Rainfall Time to Drain Time to Drain (hrs.) (hrs.) Basin #2 Basin #3 100 8.66 27 27 • The detention basins shall be inspected and monitored for mosquito breeding

Page 6

2 Basin #3 100 8.66 27 27 • The detention basins shall be inspected and monitored for mosquito breeding conditions. If significant mosquito breeding is observed, the Essex County Department of Public Works-Mosquito Control shall be contacted at (973) 239- 0342. 6

File revisions (1)