V3 RESUBMiSSION Stormwater Maintenance Manual
ca2ca904a789ee022342c5f6a3b3099a190627bebe9808d27104a70712b12a51Indexed text · page 7
Show all pagesE. ACCESS • Access to the detention basins is shown on Figure 1 in the Appendix of this Manual. IV. MAINTENANCE COST ESTIMATE Sub-Surface Detention Basins ………………………………$1,500 – $2,000 per year Surface Detention Basins…….…………………..……………….…....$1,500 per year Maintenance cost estimate includes all maintenance tasks, including seed, equipment, sediment, trash and debris removal. Maintenance cost estimates are based on engineering assumptions, manufacturer’s recommendations as well as the relative frequency of maintenance. Actual costs may differ from estimate. V. APPENDIX TABLE 4 – 1 SUMMARY OF MAINTENANCE PROCEDURES TABLE 4 – 2 MAINTENANCE EQUIPMENT AND MATERIALS TABLE 4 – 3 MAINTENANCE WORK ORDER AND CHECKLIST TABLE 4 – 4 MAINTENANCE LOG TABLE 4 – 5 INSPECTION CHECKLIST TABLE 4 – 6 INSPECTION LOG EXHIBIT 1 7