Supporting Documentation · Jun 15, 2022
2022 10 Drainage Statement Signed
8a5378b121c9d87088e703dfb5956ed3d9e87a7ba9636de8cdd33def16f03d46Indexed text · page 26
Show all pages3 Hydrograph Summary Report Hydraflow Hydrographs by Intelisolve v9.1 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 2.723 1 724 9,167 ---- ------ ------ Existing Site (Impervious) 2 SCS Runoff 0.221 1 724 694 ---- ------ ------ Existing Site (Pervious) 3 Combine 2.944 1 724 9,861 1, 2 ------ ------ Existing Total 5 SCS Runoff 2.463 1 724 8,294 ---- ------ ------ Proposed Site (Impervious) 6 SCS Runoff 0.423 1 724 1,260 ---- ------ ------ Proposed Site (Pervious) 7 Combine 2.886 1 724 9,553 5, 6 ------ ------ Proposed Total 2021-11-01 2, 10, 100 yr.gpw Return Period: 2 Year Monday, Oct 24, 2022
File revisions (1)
- Sep 29, 2026
8a5378b121c93,964,545 bytes