PROJECT DETAILS I. Introduction and Description of Facilities: The purpose of this report is to provide guidelines and information regarding the required maintenance for the proposed stormwater management facilities to be constructed in association with the development of Block 153, Lot 38 located in the Township of West Orange, in Essex County, New Jersey. The Applicant proposes to develop the lot with a 2,537 SF Popeyes fast-food restaurant with a drive-thru and a second approximately 2,800 SF fast-food restaurant with a drive- thru. The second tenant is still to be confirmed. Additional site amenities including, parking, landscaping, lighting, stormwater management facilities, utilities and other site amenities as shown on the accompanying Site Plan drawings. The proposed stormwater management system includes the construction of inlets and conveyance pipes. The stormwater management facilities will contribute toward the collection and conveyance of runoff generated by the proposed development. Every stormwater management system, whether at grade or below grade, requires that basic periodic maintenance be performed in order to maintain the proper functioning and operation of the system. This report will outline these procedures, further discuss responsibilities and highlight those responsible for performing said maintenance. The proposed stormwater management facility has been designed to accept stormwater runoff from most of the paved parking areas, drive aisles, and surrounding landscaped and open space areas. These facilities will require periodic inspections and maintenance. The following information can be considered a guideline for the continued maintenance including suggested inspection scheduling as well as performance objectives. II. Project Contacts: The applicant is responsible to maintain a detailed log of all preventative and corrective maintenance actions for the constructed stormwater facilities incorporated into the design, including record of all inspections and copies of all maintenance-related work orders. The applicant is also responsible for maintenance to evaluate the effectiveness of the maintenance plan at least once per year and adjust the plan and deed as needed.

Page 3

elated work orders. The applicant is also responsible for maintenance to evaluate the effectiveness of the maintenance plan at least once per year and adjust the plan and deed as needed. The applicant shall retain a copy of this report onsite should a public entity request this report or documentation of said maintenance in the future. Operation & Maintenance Manual 1 October 2022 DEC# 1021-99-025

File revisions (1)