Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 15, 2022

2022 10 OM Manual

Preserved file SHA-256e46e10c74de2114cbfbbc58ed52a65f3c8832753dffdab2e0c3f6ed439f5a265

Indexed text · page 6

Show all pages
Page 6

As noted previously, it is recommended that all water be evacuated from the system with a pump before any significant amount of sediment, settled debris or trash is removed from the system. The lack of an available disposal site should not delay the removal of trash, debris and sediment. Temporary disposal sites should be utilized if necessary. b) Structural Repairs: Structural damage to inlet structures, roadways and walls as a result of vandalism, flood events, settlement or other causes must be repaired promptly. The urgency of the repairs will depend upon the nature of the damage and its effects on the safety and operation of the facility. The analysis of structural damage and the design and performance of structural repairs should only be undertaken by the consulting Professional Engineer. c) Snow and Ice Removal: Accumulations of snow and ice can threaten the functioning of the inlets. Provision of the equipment, material and personnel to monitor and remove snow and ice from critical areas will assure the function of the facility during the winter months. 3. Aesthetic Maintenance Procedures a) Graffiti Removal: The timely removal of graffiti will restore the aesthetic quality of the facilities. Removal can be accomplished by paint or other cover, or removal with scrapers, solvents or cleansers. Timely removal is important to discourage further graffiti and other acts of vandalism. b) Grass Trimming/Landscape Maintenance: The lawn areas shall be mowed on a regular basis as necessary to maintain the lawn at a height of 2 to 3-inches (at least once a month during the growing season). These areas shall also be fertilized twice a year, once in the spring and once in the fall. Fertilizer for lawn areas shall be 10-20-10 applied at a rate of 11 lbs. per 1,000 SF or as determined by a soil test. Any bare, dead or damaged lawn areas shall be re-seeded in accordance with the original procedures as outlined in the Soil Erosion and Sediment Control Plans using the same mix and seeding rates. Stabilization of bare or damaged areas shall be done in a timely fashion so as to avoid exposing the soil to erosion. If season prevents the re-establishment of turf cover, exposed areas should be stabilized with straw or salt hay mulch as described in the Soil Erosion and Sediment Control Plans until permanent seeding Operation &

Page 6

ts the re-establishment of turf cover, exposed areas should be stabilized with straw or salt hay mulch as described in the Soil Erosion and Sediment Control Plans until permanent seeding Operation & Maintenance Manual 4 October 2022 DEC# 1021-99-025

File revisions (1)