Supporting Documentation · Jun 15, 2022
2 ZBA Application
7c3017428c5a09f5de7018b9d13757acce07d3caa4daf14227d55e6b766eea86Indexed text · page 122
Show all pagesA-1 Amended Detailed Utility and Grading Plan dated 5/6/16, revised to 5/12/16; A-2 Original Detailed Utility and Grading Plan dated 9/10/08, and revised to 7/31/14; A-3 Construction Plan for Football field and Tack, sheet 4 of 9, dated 2/12/16; A-4 Drainage Plan for Football field and Track, sheet 5 of 9 dated 2/12/16; A-5 Proposed Scoreboard Rendering and Specifications for Football field; A-6 Landscape Plan dated 4/19/16; A-7T Original Detailed Utility and Grading Plan dated 9/10/08 and revised to 7/5/16; A-8 Proposed signage; and WHEREAS, the Board considered the testimony of Eric Keller, of Bowman Consulting, West Orange Township Consulting Engineers and Mr. Keller's reports dated June 13, 2016, June 14, 2016 and July 14, 2016; and WHEREAS, the Board considered the testimony of Paul Grygiel, West Orange Acting Planning Director and Mr. Grygiel’s report dated June 13, 2016; and WHEREAS, Public Advocate Harvey Grossman, Esq. was present during the Application; and
File revisions (1)
- Sep 29, 2026
7c3017428c5a4,911,093 bytes