Supporting Documentation · Jun 15, 2022
2 ZBA Application
7c3017428c5a09f5de7018b9d13757acce07d3caa4daf14227d55e6b766eea86Indexed text · page 129
Show all pagesManual. - The Applicant will straighten out the painted median of the entrance drive to be perpendicular to Prospect Avenue. . The Applicant will perform a video inspection of the sanitary sewer line into which it is tapping from its current terminus on the Shillelagh Club to the manhole in Prospect Avenue. ‘The video inspection and associated report are to be provided to the Board and Township Engineers for review. Should this inspection find any deficiencies in the existing pipe corrective actions are to be implemented. . The area by the football bleachers will be re- Graded in a manner which does not disturb the existing trees to be preserved. - The millings of the old track will be disposed of off-site in accordance with applicable regulations and will not be re-used on site. Construction vehicles shall not be permitted to travel over the cross-country track near and within the natural buffer 42
File revisions (1)
- Sep 29, 2026
7c3017428c5a4,911,093 bytes