Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 15, 2022

2 ZBA Application

Preserved file SHA-2567c3017428c5a09f5de7018b9d13757acce07d3caa4daf14227d55e6b766eea86

Indexed text · page 19

Show all pages
Page 19

EEE SCHEDULES (iv) 25-564 Site Plans - Residential Application Fees. a Sketch Plat Fee $75.00 N/A b, Preliminary Application Base fee $200.00 a) Plus unit fee 50.00 c. Final Application Base fee $100.00 (1) Plus unit fee 25.00 (Ord, No. 2357-11 § 25-56.4) 25-56.3 Variances and Conditional Use Application Fees. a “D" Variances Nonresidential $350.00 () Residential 1-2 family (owner occupied) $75.00 1-2 family (non- owner occupied) 125.00 Other 150.00 Public/Quasi public 100.00 b. “C" Variances Nonresidential $250.00 Residential 1-2 family (owner occupied) $75.00 1-2 family (non- owner occupied) 125.00 Other 250.00 Public/Quasi public 100.00 c Interpretations and Appeals Fee $150.00 d. Conditional Uses Fee $300.00 Separate fee(s) shall be required for each application type. Therefore, if an application package consists of a “D” variance, “C” variance and site plan, the total fee shall be the sum of the fees for each separate application. The escrow charge shall be the maximum for any one type of application, Where disbursements from the escrow account leave less than ten (10%) percent of the original deposit, the applicant shal! replenish the account in an amount equal to the original deposit, (Sec | | } |

File revisions (1)