Supporting Documentation · Jun 15, 2022
2 ZBA Application
7c3017428c5a09f5de7018b9d13757acce07d3caa4daf14227d55e6b766eea86Indexed text · page 33
Show all pagesVIL TER 25-51.7.2 L_ BE Al HEREBY IS AMENDED AND SUPERCEDED TO READ AS FOLLOWS: 25-51.7.2 Major Site Plan Requirements - Final Stage. A complete application for a final major site plan shall include all applicable administrative requirements as delineated in subsection 25-51.2 and the following information on one (1) or more maps or attached to the application form if it cannot be mapped, (ce AE a. Verification that all of the conditions of the preli minary approval have been met, b. A map or maps which comply with this chapter depicting that portion of the project for which final approval is being requested. ic ‘A developer's agreement if required by the preliminary approval. a A statement indicating the reasons for any deviations from approved preliminary site plan. e. Any off-tract improvement contributions if required. £ Four (4) copies of a map, referred to as a "Run Card", depicting the location of all fire hydrants within the subject property, and depicting the surrounding streets, based on a scale of one (1) inch equaling four hundred (400) feet, and contained on an eight and one-half by eleven (8.5 x-11) inch paper within an area not to exceed seven and one-half (7.5) inches in width and eight (8) inches in height. VU. CHAPTER 25-518 SHALL BE AND HEREBY IS AMENDED AND SUPERCEDED TO READ AS FOLLOWS: 25-518 Conditional Use Requirements, No conditional use application shall be considered complete unless it fully conforms with Subsections 25-51.2, 25-51.6 and 25-51,7.1 as well as the following requirements: a A notation indicating the section of this chapter that allows the conditional use as proposed. b. A listing of the conditional use standards that apply to the subject proposal. VIL 25-51.9 BE RE] AND SUPERCEDED TO At LLOWS: 25-51,9—"C" Variance Requirements, No “c" or bulk variance application shall be considered complete unless it fully conforms with subsection 25-51.2 as well as the following requirements: Ca a A map, either in conformance with subsections 25-513, 25-51.4, 25-515, 25-51.6 and = 25-51.7.1 or if the application is to be bifurcated, a separate map, signed and sealed by an architect, engineer, planner or surveyor which provides sufficient data (i.¢., setbacks, lot
File revisions (1)
- Sep 29, 2026
7c3017428c5a4,911,093 bytes