Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jun 15, 2022

2 ZBA Application

Preserved file SHA-2567c3017428c5a09f5de7018b9d13757acce07d3caa4daf14227d55e6b766eea86

Indexed text · page 38

Show all pages
Page 38

7. Details of roofing materials designed to reduce the urban heat island effect such as: i. Construction of roof top gardens to reduce solar gain in summer and insulate in winter ii, Use of roofing materials that are no darker than a light gray or demonstrate how altemate roofing materials reduce the urban heat island effect 8. Details of any sustainable stormwater systems employed such as: i. Bioswales/ raingardens Permeable surfaces tii, Grey water systems iv. Retention and detention facilities v, Continuous trenching ‘ 9. A list of native and’ well adapted ‘species used in landscaping to eliminate the need for fertilization and pesticides. c. For each of the items listed on the Sustainability checklist form applicants must indicate the extent to which they are incorporating such a measure in the project or, alternatively, indicate the reason(s) why the measure is not being incorporated in the project. { TH. REPEAL OF CONFLICTING ORDINANCES Any Ordinances of the Township which are in conflict with this Ordinance are hereby repealed to the extent of such conflict, IV. SEVERABILITY If any part of this Ordinance shall be deemed invalid, such patts shall be severed and the invalidity thereof shall not affect the remaining parts of this Ordinance. Vv. EFFECTIVE DATE This Ordinance shall take effect upon final passage and publication in accordance with the law. ‘4 fess da. wd J eel pup Poncet President BNL stot ly. nicipal Clerk Cart Cant evale, Mw Introduced: April 14, 2015 Adopted: May 12, 2014 As of Apri 2, 2015

File revisions (1)