Supporting Documentation · Jun 15, 2022
2023 01 13 SCD Certification
2a7cd91da9021daaef49e6e9e465f2d3edd8828af13b443c02c0cb67329b78fdIndexed text · page 1
Show all pagesHUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT New Jersey Natural Resources 80 ORCHARD STREET Conservation Program BLOOMFIELD, Nu 07003-5104 Telephone: (862) 333-4505 Fax: (862) 333-4507 www.hepsoilnj.org January 13, 2023 Sachin Shah MPB Realty, LLC 301 Rt 17 North, Suite 802 Rutherford, NJ 07070 RE: MPB Realty Popeye’s Restaurant 470 Eagle Rock Ave, West Orange, NJ Block: 153 Lot: 38 HEPSCD Ch.251 ID# 222-E-6675 plan by Dynamic Engineering, dated 1/3/23 Dear Applicant: The District has completed the review of the soil erosion and sediment control plan for the above referenced project and hereby reports that the plan meets the Standards for Soil Erosion and Sediment Control in New Jersey (N.J.A.C.290-1.1 et seq., promulgated pursuant to the New Jersey Soil Erosion and Sediment Control Act, N.J.S.A.4- 24-39 et seq.). Accordingly, the plan is certified by the Hudson-Essex-Passaic Soil Conservation District subject to the following conditions: * 48 hours prior to the commencement of any construction activity, complete & submit the District Start Notice form. The form is included in this mailing. e Acopy of the certified plan must be kept on the job site at all times. * The applicant or contractor must request a final inspection (once landscaping and final soil stabilization is complete) & obtain a Report of Compliance prior to seeking a temporary or permanent Certificate of Occupancy. © The District must be provided with written notification of any conveyance of this project, subject property, or Portions thereof, including individual residential lots if applicable. Said notice must provide the names, addresses, and telephone numbers of subsequent owners. * — The District must be informed of address and or telephone number changes of owners, agents responsible for site construction, and job supervisors. Please be advised that the Soil Erosion and Sediment Control Act authorizes the issuance of stop construction orders and penalties of up to $3000 per day for violations of the certified plan or for failure to comply with the aforementioned requirements. Please be further advised that any conveyance of this project or portions thereof will transfer full responsibility for compliance with the certified plan to subsequent owners. Please contact the District if you require assistance implementing the certified soil erosion and sediment control plan. This
esponsibility for compliance with the certified plan to subsequent owners. Please contact the District if you require assistance implementing the certified soil erosion and sediment control plan. This certification is valid for 3-1/2 years from the date of this letter and is limited to the controls specified in this plan. It is not authorization to engage in proposed land use unless such use has been previously approved by the mui ality or other controlling agency. Yours truly, Matthew J. Ward Chairman Cc: Planner, Municipality, County STATE DEPARTMENT OF AGRICULTURE, STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION, AND UNITED STATES NATURAL RESOURCES CONSERVATION SERVICE, COOPERATING. Printed on Recycled Paper
File revisions (1)
- Sep 29, 2026
2a7cd91da9021,006,582 bytes