Supporting Documentation · Feb 9, 2023
V4 08 EIS 1 26 2023
605a9e303e0d7fa7c3c41091dc3dff4b29df8628cd9ab2ce70b643d50d7d2090Indexed text · page 9
Show all pagesVegetation – The proposed project calls for the removal of approximately 181 trees as defined by the ordinance (32 of which are dead), resulting in the removal of 149 live trees. The majority of those trees are in existing disturbed areas and are part of the overall landscape of the built environment. If the future parking is not constructed within the southeasterly corner of the parking lot, an additional 30 trees will be able to remain onsite. A complete tree removal plan has been prepared and accompanies the Tree Removal Application that was simultaneously submitted with the application for development. The proposed Site Plan includes a Landscape Plan, prepared by the architectural firm, that incorporates replacement trees and shrubs. Wildlife – Because the existing wooded buffer will remain largely untouched, there should be no affect on the wildlife that utilizes that area for habitat and/or foraging. Unique, Scenic & Historic Features – The site is not identified as Unique, Scenic or Historic Air Quality Degradation – The proposed site improvements include Soil Erosion and Sediment Control measures to protect against sediment as well as dust control. The measures called for are accepted by the State as reasonable solutions for the short-term impacts of construction. We do not anticipate any long-term impacts as the proposed use is dominantly residential in character and this type of use poses no real impact to air quality. Noise – Short-term impacts of construction are generally not considered permanent impacts. The construction hours will be limited in accordance with the Municipal Ordinance requirements. In this instance, it is anticipated that the demolition and construction may be phased, causing these impacts to extend longer to accommodate the phasing. However, the long-term impacts are limited due to the type of use proposed. Items like roof-mounted HVAC equipment will be screened, which provides for sound attenuation. This is in contrast to the equipment servicing the existing building, which is both old and largely un-screened. 9
File revisions (1)
- Sep 29, 2026
605a9e303e0d10,647,562 bytes