Supporting Documentation · Feb 9, 2023
V4 10 Traffic Impact Study Rev 2 1 27 2023
8dbfc1505c351dfdfca4079a200faabf1de80812910ef24702008ac05b00c34eIndexed text · page 19
Show all pages#N/A #N/A (0%) (0%) (0%) #N/A #N/A 40% 0% 0% 0% (0%) 0% (0%) Mount Pleasant Avenue (Route 10) 20% (0%) (0%) 0% (0%) 0% (0%) 10% #N/A #N/A 0% 0% 0% #N/A #N/A (10%) (40%) (20%) Pleasant Valley Way
(20%) Pleasant Valley Way (0%) (0%) 20% 50% North Site Driveway (20%) 0% (10%) 0% #N/A #N/A 10% 0% (0%) (50%) (10%) Site (0%) 50% 0% South Site Driveway (50%) 0% (20%) 0% #N/A #N/A 20% 10% (0%)
10% (0%) (0%) (30%) (0%) 0% 0% Kessler Driveway (0%) 0% (0%) 0% #N/A #N/A 0% 30% LEGEND Existing Roadway (0%) (0%) Proposed Roadway IIN (OUT) Signalized Intersection Proposed Nursing Home Redevelopment Figure 5 Traffic Impact Study - Rev 2 4041-99-001TE Percent Distribution
File revisions (1)
- Sep 29, 2026
8dbfc1505c35886,394 bytes