Supporting Documentation · Feb 9, 2023
V4 10 Traffic Impact Study Rev 2 1 27 2023
8dbfc1505c351dfdfca4079a200faabf1de80812910ef24702008ac05b00c34eIndexed text · page 32
Show all pages4041-99-001TE Existing - AM 20: Pleasant Valley Way & Kessler Driveway Lane Group EBL EBR NBL NBT SBT SBR Queue Length 50th (ft) 2 1 0 0 0 Queue Length 95th (ft) 18 16 11 128 193 Internal Link Dist (ft) 378 369 272 Turn Bay Length (ft) 150 190 Base Capacity (vph) 533 477 525 2069 2014 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.02 0.02 0.09 0.35 0.46 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 42.7 Natural Cycle: 45 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.49 Intersection Signal Delay: 2.2 Intersection LOS: A Intersection Capacity Utilization 54.3% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 20: Pleasant Valley Way & Kessler Driveway 01/24/2023 Synchro 11 Report CGH/JTT Lanes, Volumes, Timings
File revisions (1)
- Sep 29, 2026
8dbfc1505c35886,394 bytes