Supporting Documentation · Feb 9, 2023
V4 10 Traffic Impact Study Rev 2 1 27 2023
8dbfc1505c351dfdfca4079a200faabf1de80812910ef24702008ac05b00c34eIndexed text · page 35
Show all pages4041-99-001TE Existing - PM 10: Pleasant Valley Way & Route 10 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 123 210 19 116 168 148 46 707 124 91 371 141 Future Volume (vph) 123 210 19 116 168 148 46 707 124 91 371 141 Ideal Flow (vphpl) 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 Lane Width (ft) 11 11 16 10 10 16 10 10 10 10 11 11 Grade (%) -8% 0% -2% -1% Storage Length (ft) 0 150 0 75 60 0 110 0 Storage Lanes 0 1 0 1 1 0 1 0 Taper Length (ft) 25 25 50 20 Lane Util. Factor 0.95 0.95 1.00 0.95 0.95 1.00 1.00 0.95 0.95 1.00 0.95 0.95 Frt 0.850 0.850 0.978 0.959 Flt Protected 0.982 0.980 0.950 0.950 Satd. Flow (prot) 0 3820 2104 0 3599 2003 1844 3642 0 1853 3671 0 Flt Permitted 0.982 0.980 0.388 0.149 Satd. Flow (perm) 0 3820 2104 0 3599 2003 753 3642 0 291 3671 0 Right Turn on Red Yes Yes No No Satd. Flow (RTOR) 131 151 Link Speed
Yes Yes No No Satd. Flow (RTOR) 131 151 Link Speed (mph) 40 40 45 40 Link Distance (ft) 378 977 1545 744 Travel Time (s) 6.4 16.7 23.4 12.7 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 5% 2% 0% 2% 1% 1% 2% 1% 1% 1% 1% 2% Shared Lane Traffic (%) Lane Group Flow (vph) 0 350 20 0 299 156 48 875 0 96 539 0 Turn Type Split NA Perm Split NA Perm pm+pt NA pm+pt NA Protected Phases 6 6 2 2 3 8 7 4 Permitted Phases 6 2 8 4 Detector Phase 6 6 6 2 2 2 3 8 7 4 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 10.0 7.0 10.0 Minimum Split (s) 14.0 14.0 14.0 14.0 14.0 14.0 10.0 18.0 10.0 18.0 Total Split (s) 34.0 34.0 34.0 37.0 37.0 37.0 10.0 44.0 10.0 44.0 Total Split (%) 27.2% 27.2% 27.2% 29.6% 29.6% 29.6% 8.0% 35.2% 8.0% 35.2% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 3.0 4.0 3.0 4.0 All-Red Time (s) 3.0 3.0 3.0 3.0 3.0 3.0 0.0 4.0 0.0 4.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 7.0 7.0 7.0
4.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 7.0 7.0 7.0 7.0 3.0 8.0 3.0 8.0 Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Recall Mode Min Min Min Max Max Max None Max None Max Act Effct Green (s) 17.0 17.0 30.0 30.0 48.1 36.0 48.7 38.1 Actuated g/C Ratio 0.15 0.15 0.26 0.26 0.42 0.31 0.42 0.33 v/c Ratio 0.62 0.05 0.32 0.25 0.13 0.77 0.44 0.44 Control Delay 51.0 0.2 35.9 7.1 20.2 41.5 26.2 32.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 51.0 0.2 35.9 7.1 20.2 41.5 26.2 32.7 LOS D A D A C D C C Approach Delay 48.3 26.0 40.4 31.7 Approach LOS D C D C 01/24/2023 Synchro 11 Report CGH/JTT Lanes, Volumes, Timings
File revisions (1)
- Sep 29, 2026
8dbfc1505c35886,394 bytes