Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 9, 2023

V4 10 Traffic Impact Study Rev 2 1 27 2023

Preserved file SHA-2568dbfc1505c351dfdfca4079a200faabf1de80812910ef24702008ac05b00c34e

Indexed text · page 37

Show all pages
Page 37

4041-99-001TE Existing - PM 20: Pleasant Valley Way & Kessler Driveway Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 138 47 9 741 487 29 Future Volume (vph) 138 47 9 741 487 29 Ideal Flow (vphpl) 2100 2100 2100 2100 2100 2100 Lane Width (ft) 12 12 11 12 12 12 Grade (%) -9% 1% 2% Storage Length (ft) 0 150 190 0 Storage Lanes 1 1 1 0 Taper Length (ft) 25 60 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.992 Flt Protected 0.950 0.950 Satd. Flow (prot) 2085 1865 1919 2069 2043 0 Flt Permitted 0.950 0.388 Satd. Flow (perm) 2085 1865 784 2069 2043 0 Right Turn on Red No Yes Satd. Flow (RTOR) 11 Link Speed (mph) 25 45 45 Link Distance (ft) 458 449 352 Travel Time (s) 12.5 6.8 5.3 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 Heavy Vehicles (%) 0% 0% 0% 1% 1% 0% Shared Lane Traffic (%) Lane Group Flow (vph) 152 52 10 814 567 0 Turn Type Prot Perm Perm NA NA Protected Phases 4 2 6 Permitted Phases 4 2 Detector Phase 4 4 2 2 6 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 Minimum Split (s) 12.0 12.0 12.0 12.0 12.0 Total Split (s) 15.0 15.0 75.0 75.0 75.0 Total Split (%)

Page 37

0 7.0 7.0 7.0 7.0 Minimum Split (s) 12.0 12.0 12.0 12.0 12.0 Total Split (s) 15.0 15.0 75.0 75.0 75.0 Total Split (%) 16.7% 16.7% 83.3% 83.3% 83.3% Yellow Time (s) 3.0 3.0 3.0 3.0 3.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Recall Mode None None Min Min Min Act Effct Green (s) 8.7 8.7 25.7 25.7 25.7 Actuated g/C Ratio 0.20 0.20 0.58 0.58 0.58 v/c Ratio 0.37 0.14 0.02 0.68 0.48 Control Delay 18.7 16.3 4.4 10.3 7.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 18.7 16.3 4.4 10.3 7.2 LOS B B A B A Approach Delay 18.1 10.3 7.2 Approach LOS B B A 01/24/2023 Synchro 11 Report CGH/JTT Lanes, Volumes, Timings

File revisions (1)