Supporting Documentation · Feb 9, 2023
V4 10 Traffic Impact Study Rev 2 1 27 2023
8dbfc1505c351dfdfca4079a200faabf1de80812910ef24702008ac05b00c34eIndexed text · page 52
Show all pages4041-99-001TE No Build - PM 40: Pleasant Valley Way & South Site Driveway Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 15 8 5 984 572 1 Future Vol, veh/h 15 8 5 984 572 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - - 105 - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % -4 - - -2 2 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 1 1 2 Mvmt Flow 16 8 5 1036 602 1 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1649 603 603 0 - 0 Stage 1 603 - - - - - Stage 2 1046 - - - - - Critical Hdwy 5.62 5.82 4.12 - - - Critical Hdwy Stg 1 4.62 - - - - - Critical Hdwy Stg 2 4.62 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 157 534 975 - - - Stage 1 625 - - - - - Stage 2 427 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 156 534 975 - - - Mov Cap-2 Maneuver 156 - - - - - Stage 1 622 - - - - - Stage 2 427 - - - - - Approach EB NB SB HCM Control Delay, s 24.7 0 0 HCM LOS C Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 975 - 207 - - HCM Lane V/C Ratio 0.005 - 0.117 - - HCM Control Delay (s) 8.7 - 24.7 - - HCM Lane LOS A - C - - HCM 95th %tile Q(veh) 0 -
.005 - 0.117 - - HCM Control Delay (s) 8.7 - 24.7 - - HCM Lane LOS A - C - - HCM 95th %tile Q(veh) 0 - 0.4 - - 01/24/2023 Synchro 11 Report CGH/JTT HCM 6th TWSC
File revisions (1)
- Sep 29, 2026
8dbfc1505c35886,394 bytes