Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 9, 2023

V4 10 Traffic Impact Study Rev 2 1 27 2023

Preserved file SHA-2568dbfc1505c351dfdfca4079a200faabf1de80812910ef24702008ac05b00c34e

Indexed text · page 60

Show all pages
Page 60

4041-99-001TE Build - PM 10: Pleasant Valley Way & Route 10 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Queue Length 50th (ft) 147 0 111 16 25 370 47 200 Queue Length 95th (ft) 200 0 163 75 54 #526 #93 277 Internal Link Dist (ft) 298 897 1465 664 Turn Bay Length (ft) 150 75 60 110 Base Capacity (vph) 886 588 927 626 335 1125 184 1201 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.44 0.04 0.37 0.28 0.17 0.88 0.58 0.51 Intersection Summary Area Type: Other Cycle Length: 125 Actuated Cycle Length: 116.5 Natural Cycle: 65 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 40.5 Intersection LOS: D Intersection Capacity Utilization 69.5% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 10: Pleasant Valley Way & Route 10 01/24/2023 Synchro 11 Report CGH/JTT Lanes, Volumes, Timings

File revisions (1)