Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 9, 2023

V4 06 Response to Board Engineers Review 2 1 26 2023

Preserved file SHA-2567bfc402fe296a4bad8e19f879b231737b83159b9b84647187d1c3bc553a885d3

Indexed text · page 2

Show all pages
Page 2

2 comment. It should also be noted that the Stormwater Management Report was revised to include the reductions associated with the green roof. Our revisions include the following documents: • Site Plans • Overall Phasing Plan • Tree Removal Plans • Stormwater Report • Maintenance Manual • Environmental Impact Statement • Parking Study • Lighting cut sheets (enclosed) B. DESIGN COMMENTS 1. The Applicant has not requested any submission waivers in support of this application. PETRY RESPONSE: Statement. No response is required. 2. The Applicant has requested a waiver from the requirement to incorporate green infrastructure into the design of the project. The Applicant states that the soils from the site that were tested did not have adequate permeability for infiltration. PETRY RESPONSE: Statement. No response required. 3. The Applicant has requested a de minimis exception from the Residential Site Improvement Standards to permit 381 parking spaces whereas 479 parking spaces are required. PETRY RESPONSE: 381 parking spaces represents only the physical spaces. When applying the EV credit, the total onsite parking spaces is 429. It should also be noted that based on the revised unit count, the total required parking spaces has been reduced to 448 spaces. 4. Sheet SP-3 of the site plan drawings states that 8 electric vehicle stations in the garage will be installed within 3 years of C.O. and an additional 12 electric vehicle stations in the garage will be installed within 6 years of C.O. Sheet Al .0 of the architectural plans must be revised to identify the electric vehicle stations that will be installed within 3 years and the electric vehicle stations that will be installed within 6 years.

File revisions (1)