Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Feb 9, 2023

V4 06 Response to Board Engineers Review 2 1 26 2023

Preserved file SHA-2567bfc402fe296a4bad8e19f879b231737b83159b9b84647187d1c3bc553a885d3

Indexed text · page 5

Show all pages
Page 5

5 14. As required by §25-29.3a of the Land Use Regulations, the minimum standards for groundwater recharge, stormwater quality and stormwater runoff quantity shall be met by incorporating green infrastructure. Since the property in question is located in the Metropolitan Planning Area, the Applicant is not required to address groundwater recharge. In addition, it states in §25-29.4q that stormwater runoff quality standards are only applicable when the major development results in an increase of one-quarter acre or more of regulated motor vehicle surface which this project does not. Therefore, the Applicant must demonstrate that the project meets the minimum standards for stormwater runoff quantity set forth in §25-29.40 and r. As stipulated in §25-29.403, the design engineer shall utilize BMPs from Table 1 or from Table 2 and/or an alternative stormwater management measure approved in accordance with §25-29.4g. The Applicant has requested a waiver from the requirement to incorporate green infrastructure into the design of the project. The Applicant states that the soils from the site that were tested did not have adequate permeability for infiltration. The Applicant should provide testimony to the Board setting forth the reasons why the requested waiver should be granted. PETRY RESPONSE: Testimony has been provided. 15. Our office has reviewed the Stormwater Maintenance Manual and finds that Section I must be revised to include the telephone number of the responsible party. PETRY RESPONSE: The telephone number for Daughters of Israel has been added to the Maintenance Manual. 16. The Stormwater Maintenance Manual and any future revisions must be recorded upon the deed of record for the property. Prior to recording, the form of the deed must be approved by the Board Attorney and our office. PETRY RESPONSE: A note to this effect has been added to the plans (See Sheet SP-1). 17. It remains for the plans to be revised to include the following details: a. Fence. b. Screening fence. c. EV charging station. d. Wet tap. e. Grease trap. f. Emergency generator.

File revisions (1)