Supporting Documentation · Feb 9, 2023
V4 12 Stormwater Maintenance Manual
Preserved file SHA-256
f41cd2aa1331dc0cf62992b06a83f27408d9d80c43c8055a09773865117149caIndexed text · page 16
Show all pagesMAINTENANCE COST ESTIMATE Sub-Surface Detention Basin ...............c1ccseeeeeeeeecaeeeeeeeeneeeneeeeas $1,500 — $2,000 per year Maintenance cost estimate includes all maintenance inspections, equipment, sediment, trash and debris removal. Maintenance cost estimates are based on engineering assumptions, manufacturer’s recommendations as well as the relative frequency of maintenance. Actual costs may differ from estimate.
File revisions (1)
- Sep 29, 2026
f41cd2aa133110,348,617 bytes