Page 7

S16°20'00"W 104.98' S21°20'00"W 20.94' S68°40'00"E 97.52' N11°49'00"E N77°11'00"W LOT 262 LOT 265 LOT 308 LOT 264 LOT 263 LOT 304 LOT 307 84.46' 139.95' CONTAINER CONTAINER RAMP RAMP UNDERGROUND SC-310 STORMTECH CHAMBER SYSTEM TOP: 244.50 BOTTOM: 242.20 EXISTING CATCH BASIN RIM: 242.67 FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW FLOW CB-1 (SIZE 12"x12") RIM:256.42 INV OUT:252.89 (6" HDPE) CB-2 (SIZE 12"x12") RIM:254.66 INV IN:251.27 (6" HDPE) INV OUT:247.31 (6" HDPE ) OCS-1 (DIA.48") RIM:248.14 WEIR WALL WITH: - 2x9 INCH.ORIFICE HOLE @ I.E.:243.36 - 2x9 INCH.ORIFICE HOLE @ I.E.:242.95 - 5 DIA.ORIFICE HOLE @ I.E.:242.20 INV OUT:242.20 (12" HDPE) MH-1 (DIA.48") RIM:248.73 INV IN:244.46 (6" HDPE) INV IN:247.09 (6" HDPE) INV IN:244.74 (6" HDPE) CB-3 (SIZE 24"x24") RIM:248.51 INV IN:245.44 (6" HDPE ) INV IN:244.86 (6" HDPE) INV OUT:244.67 (6" HDPE) CB-6 (SIZE 12"x12") RIM:248.50 INV IN:245.36 (6" HDPE) INV OUT:245.36 (6" HDPE) 54' L.F. @ 3.00% 6" HDPE 50' L.F. @ 1.00% 6" HDPE 21' L.F. @ 1.00% 6" HDPE 29' L.F. @ 1.00% 6" HDPE 47' L.F. @ 5.39% 12" HDPE 43' L.F. @ 1.00% 6" HDPE CB-4 (SIZE 12"x12") RIM:248.58 INV OUT:246.08 (6" HDPE) 5" WIDE CHANNEL DRAIN WITH POLYPROPYLENE CB-7 (SIZE 12"x12") RIM:253.01 INV OUT:247.38 (6" HDPE) 5" WIDE CHANNEL DRAIN WITH POLYPROPYLENE TO BE CONNECTED TO CB-6 W/ 6" HDPE PIPE CB-8 (SIZE 12"x12") RIM:247.16 INV OUT:245.00 (6" HDPE) 6" UNDERGROUND PVC PIPE FOR ROOF DOWNSPOUTS CONNECTION, @ MIN. 1% SLOPE. TO BE CONNECTED TO CB-2 ROOF DOWNSPOUTS, TYP. CLEAN OUT 29' L.F. @ 1.00% 6" HDPE29' L.F. @ 1.00% 6" HDPE CB-5 (SIZE 12"x12") RIM:248.50 INV IN:245.65 (6" HDPE) INV OUT:245.65 (6" HDPE) PARK DRIVE NORTH MAIN STREET FLOW FLOW 26' L.F. @ 1.00% 6" HDPE 19' L.F. @ 10.00% 6" HDPE PVC INSPECTION PORT DETAIL (SC SERIES CHAMBER) (SEE DETAIL 4 SHEET 10) © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS SCALE: 1" = 200' USGS LOCATION MAP AR AR AR AR DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: BYDATENO. DESCRIPTION ISSUED FOR PERMIT APPLICATION PROPOSED 3-STORY APARTMENT BUILDING 410 MAIN ST, WEST ORANGE, NJ SCALE: SITE WEST ORANGE TOWNSHIP, ESSEX COUNTY, NJ CIVIL & STRUCTURAL ENGINEERS 293 RT. 18 SOUTH, #D-152 EAST BRUNSWICK, NJ 08816 TEL. 347-762-8364 FAX 201-753-5251 ALI@SMBTCONSULTANTS.COM CERTIFICATE OF AUTHORIZATION NO.: 24GA28353100 SHEET: DWG: N.J. PROFESSIONAL ENGINEER LIC. NO.

Page 7

RT. 18 SOUTH, #D-152 EAST BRUNSWICK, NJ 08816 TEL. 347-762-8364 FAX 201-753-5251 ALI@SMBTCONSULTANTS.COM CERTIFICATE OF AUTHORIZATION NO.: 24GA28353100 SHEET: DWG: N.J. PROFESSIONAL ENGINEER LIC. NO. 53255 ALIASGAR RANGWALA, P.E. N DATE: 1/16/2024 OF 16 COPYRIGHT 2022 ALL RIGHTS RESERVED. THE COPY OR REUSE OF THIS DOCUMENT OR ANY PORTION THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SMBT CONSULTANTS. THIS DRAWING IS THE SOLE PROPERTY OF SMBT CONSULTANTS AND HAS BEEN PREPARED SPECIFICALLY FOR USE BY THE OWNER OF THIS PROJECT AT THIS SITE. NEW JERSEY INDUSTRIAL CODE REQUIRES DRILL, OR BLAST - STOP CALL AR5/16/20241 REV. SUBMISSION PER COUNTY COMMENTS DATED 4/18/24 0 FEET 10 20 SCALE 1"-10' STORMWATER MANAGEMENT PLAN 1" = 10'1 STORMWATER MANAGEMENT PLAN LEGEND PROPOSED CONCRETE PROPOSED RETAINING WALL PROPERTY LINE N PROPOSED PIPE 7 CHANNEL DRAIN SPECIFICATIONS NTS2 STORMWATER NOTES: 1. CONTRACTOR TO FIELD VERIFY POSSIBILITY OF CONNECTION TO EXISTING CATCH BASIN PRIOR TO CONSTRUCTION. IF ANY DISCREPANCY OCCURS THAT AFFECTS THE DESIGN, CONTACT ENGINEER OF PROJECT TO PROVIDE A SITE VISIT AND DESIGN UPDATE. 2. HDPE PIPES TO BE CORRUGATED DOUBLE WALL 1" = 10' C7

Page 8

240 245 250 255 260 265 270 275 240 245 250 255 260 265 270 275 0+50 1+00 1+13 REAR STAIR EXIT ELEV. +8'-0" SECOND FLOOR SLAB ELEV. +13'-0" FIRST FLOOR SLAB ELEV. +0'-0" PROPOSED RETAINING WALL PROPOSED CONCRETE WALKWAY EXISTING GRADE LEVEL PROPOSED GRADE LEVEL PROPOSED SIDEWALK PROPOSED GRADE LEVEL PROPOSED CURB EXISTING GRADE LEVEL EXISTING GRADE LEVEL 1.5 % 2.0 % PROPOSED RETAINING WALL EXISTING RETAINING WALL TO BE DEMOLISHED 6" UNDERGROUND PVC PIPE FOR ROOF DOWNSPOUTS CONNECTION ROOF DOWNSPOTS EL.:245.26 (VARY, SEE GRADING PLAN) EL.:248.50 EL.:256.49 © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS SCALE: 1" = 200' USGS LOCATION MAP AR AR AR AR DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: BYDATENO. DESCRIPTION ISSUED FOR PERMIT APPLICATION PROPOSED 3-STORY APARTMENT BUILDING 410 MAIN ST, WEST ORANGE, NJ SCALE: SITE WEST ORANGE TOWNSHIP, ESSEX COUNTY, NJ CIVIL & STRUCTURAL ENGINEERS 293 RT. 18 SOUTH, #D-152 EAST BRUNSWICK, NJ 08816 TEL. 347-762-8364 FAX 201-753-5251 ALI@SMBTCONSULTANTS.COM CERTIFICATE OF AUTHORIZATION NO.: 24GA28353100 SHEET: DWG: N.J. PROFESSIONAL ENGINEER LIC. NO. 53255 ALIASGAR RANGWALA, P.E. N DATE: 1/16/2024 OF 16 COPYRIGHT 2022 ALL RIGHTS RESERVED. THE COPY OR REUSE OF THIS DOCUMENT OR ANY PORTION THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SMBT CONSULTANTS. THIS DRAWING IS THE SOLE PROPERTY OF SMBT CONSULTANTS AND HAS BEEN PREPARED SPECIFICALLY FOR USE BY THE OWNER OF THIS PROJECT AT THIS SITE. NEW JERSEY INDUSTRIAL CODE REQUIRES DRILL, OR BLAST - STOP CALL AR5/16/20241 REV. SUBMISSION PER COUNTY COMMENTS DATED 4/18/24 SITE CONSTRUCTION DETAILS VER.:1" = 2' HOR.:1" = 5' 1 SITE CONSTRUCTION DETAILS 8 SUB-BASE STABILIZE BASE TOP COURSE EXPANSION JOINT 1 1/2" FACE VARY, SEE PLANS 4" THICK CONCRETE 6" x 6" WIREMESH (REINFORCEMENT) NOTE: 1. USE 4000 P.S.I. CONCRETE TO MEET N.J.D.O.T. STANDARDS. DRY COMPACTED SUB-BASE DRIVEWAY DETAIL NTS3 CONCRETE SIDEWALK DETAIL NTS4 CONCRETE DRIVEWAY APRON DETAIL NTS5 CATCH BASIN SPECIFICATIONS NTS2 COMPACTED-STONEBASE PARKING SLAB, PER STRUCTURAL DRAWINGS CONCRETE CURB DETAIL NTS6 AS SHOWN C8

Page 9

12" INLET PIPE 12" OUTLET PIPE 4" WEIR WALL WITH ORIFICE HOLES 245.50 TOP OF WALL 243.36 2"x9" ORIFICE HOLE 242.95 2"x9" ORIFICE HOLE 242.20 5" ORIFICE HOLE © 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS SCALE: 1" = 200' USGS LOCATION MAP AR AR AR AR DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: BYDATENO. DESCRIPTION ISSUED FOR PERMIT APPLICATION PROPOSED 3-STORY APARTMENT BUILDING 410 MAIN ST, WEST ORANGE, NJ SCALE: SITE WEST ORANGE TOWNSHIP, ESSEX COUNTY, NJ CIVIL & STRUCTURAL ENGINEERS 293 RT. 18 SOUTH, #D-152 EAST BRUNSWICK, NJ 08816 TEL. 347-762-8364 FAX 201-753-5251 ALI@SMBTCONSULTANTS.COM CERTIFICATE OF AUTHORIZATION NO.: 24GA28353100 SHEET: DWG: N.J. PROFESSIONAL ENGINEER LIC. NO. 53255 ALIASGAR RANGWALA, P.E. N DATE: 1/16/2024 OF 16 COPYRIGHT 2022 ALL RIGHTS RESERVED. THE COPY OR REUSE OF THIS DOCUMENT OR ANY PORTION THEREOF IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF SMBT CONSULTANTS. THIS DRAWING IS THE SOLE PROPERTY OF SMBT CONSULTANTS AND HAS BEEN PREPARED SPECIFICALLY FOR USE BY THE OWNER OF THIS PROJECT AT THIS SITE. NEW JERSEY INDUSTRIAL CODE REQUIRES DRILL, OR BLAST - STOP CALL AR5/16/20241 REV. SUBMISSION PER COUNTY COMMENTS DATED 4/18/24 STANDARD DETAILS 9 NOT TO SCALE C9 CURB RAMP NTS2 CONCRETE PAVEMENT REPAIR NTS1 STEEL SIGN POST DETAIL NTS3 SIGN FACE SEE "A" SIGN FACE SEE "B" GALVANIZED STEEL SIGN POST "A" "B" GRADE NOTES: 1. ALL ASSEMBLY HARDWARE TO BE CAST ALUMINUM WITH ALUMINUM BOLTS. 2. REFER TO TYPICAL SIGN MOUNTING DETAIL FOR SIGN CONNECTION DETAILS. CEMENT CONCRETE 1'-0" DIA. 1'-6" 2" 5'-0" NOTE: ACCESSIBLE PARKING SIGN SHALL BE INSTALLED AS SHOWN AT EACH SPACE RESERVED FOR ACCESSIBLE PARKING IN ACCORDANCE WITH CABO/ANSI A117.1 ANSI STANDARD HANDICAP SIGNAGE (TYP.) 4” WIDE PARKING LINES (WHITE OR BLUE) 4” WIDE DIAGONAL LINES (WHITE OR BLUE); NO-PARKING STRIP ANSI STANDARD HANDICAP SYMBOL (WHITE OR BLUE) 20' 8' 8'9' PARKING STRIPING DETAIL NTS6 SIGN INSTALLATION DETAIL NTS5 SIGN INSTALLATION DETAIL NTS4 OUTLET CONTROL STRUCTURE DETAIL NTS7

Page 10

IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-310 SYSTEM 1. STORMTECH SC-310 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A PRE-CONSTRUCTION MEETING WITH THE INSTALLERS. 2. STORMTECH SC-310 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS. STORMTECH RECOMMENDS 3 BACKFILL METHODS: · STONESHOOTER LOCATED OFF THE CHAMBER BED. · BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. · BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR. 4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. 5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE. 6. MAINTAIN MINIMUM - SPACING BETWEEN THE CHAMBER ROWS. 7. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm). 8. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN ENGINEER. 9. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF. NOTES FOR CONSTRUCTION EQUIPMENT 1. STORMTECH SC-310 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 2. THE USE OF CONSTRUCTION EQUIPMENT OVER SC-310 & SC-740 CHAMBERS IS LIMITED: · NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS. · NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". · WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING. USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT. SC-310 STORMTECH

Page 10

ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT. SC-310 STORMTECH CHAMBER SPECIFICATIONS 1. CHAMBERS SHALL BE STORMTECH SC-310. 2. CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED POLYPROPYLENE OR POLYETHYLENE COPOLYMERS. 3. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2922 (POLETHYLENE) OR ASTM F2418 (POLYPROPYLENE), "STANDARD SPECIFICATION FOR CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 4. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION. 5. THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. 6. CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK. 7. REQUIREMENTS FOR HANDLING AND INSTALLATION: · TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT SHALL BE GREATER THAN OR EQUAL TO 400 LBS/FT/%. THE ASC IS DEFINED IN SECTION 6.2.8 OF ASTM F2418. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. 8. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL

Page 10

LY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS: · THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER. · THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE. · THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2922 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGN EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN. 9. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY. 6" (150 mm) SC-310 TECHNICAL SPECIFICATIONS PART # STUB A B C SC310EPE06T / SC310EPE06TPC 6" (150 mm) 9.6" (244 mm) 5.8" (147 mm) --- SC310EPE06B / SC310EPE06BPC --- 0.5" (13 mm) SC310EPE08T / SC310EPE08TPC 8" (200 mm) 11.9" (302 mm) 3.5" (89 mm) --- SC310EPE08B / SC310EPE08BPC --- 0.6" (15 mm) SC310EPE10T / SC310EPE10TPC 10" (250 mm) 12.7" (323 mm) 1.4" (36 mm) --- SC310EPE10B / SC310EPE10BPC --- 0.7" (18 mm) SC310EPE12B 12" (300 mm) 13.5" (343 mm) --- 0.9" (23 mm) SC310EPE12BR 12" (300 mm) 13.5" (343 mm) --- 0.9" (23 mm) ALL STUBS, EXCEPT FOR THE SC310EPE12B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694. * FOR THE SC310EPE12B THE 12" (300 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 0.25" (6 mm). BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL. NOTE: ALL DIMENSIONS ARE NOMINAL NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) 34.0" X 16.0" X 85.4" (864 mm X 406 mm X 2169 mm) CHAMBER STORAGE 14.7 CUBIC FEET (0.42 m³) MINIMUM INSTALLED STORAGE* 31.0 CUBIC FEET (0.88 m³) WEIGHT 35.0 lbs. (16.8 kg) *ASSUMES 6" (152 mm) ABOVE, BELOW, AND BETWEEN CHAMBERS PRE-FAB STUB AT BOTTOM OF END CAP WITH FLAMP END WITH "BR" PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" PRE CORED END CAPS END WITH "PC" 34.0" (864

Page 10

ITH FLAMP END WITH "BR" PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" PRE CORED END CAPS END WITH "PC" 34.0" (864 mm) 16.0" (406 mm) 90.7" (2304 mm) ACTUAL LENGTH 85.4" (2169 mm) INSTALLED LENGTH BUILD ROW IN THIS DIRECTION A A B C 9.9" (251 mm) 15.6" (396 mm) OVERLAP NEXT CHAMBER HERE (OVER SMALL CORRUGATION) START END 2INSERTA-TEE SIDE INLET DETAIL INSERTA TEE CONNECTION CONVEYANCE PIPE MATERIAL MAY VARY (PVC, HDPE, ETC.) PLACE ADSPLUS WOVEN GEOTEXTILE (CENTERED ON INSERTA-TEE INLET) OVER BEDDING STONE FOR SCOUR PROTECTION AT SIDE INLET CONNECTIONS. GEOTEXTILE MUST EXTEND 6" (150 mm) PAST CHAMBER FOOT INSERTA TEE TO BE INSTALLED, CENTERED OVER CORRUGATION SIDE VIEWSECTION A-A A A DO NOT INSTALL INSERTA-TEE AT CHAMBER JOINTS (X) CHAMBER MAX DIAMETER OF INSERTA TEE HEIGHT FROM BASE OF CHAMBER (X) SC-310 6" (150 mm) 4" (100 mm) SC-740 10" (250 mm) 4" (100 mm) DC-780 10" (250 mm) 4" (100 mm) MC-3500 12" (300 mm) 6" (150 mm) MC-4500 12" (300 mm) 8" (200 mm) MC-7200 12" (300 mm) 8" (200 mm) INSERTA TEE FITTINGS AVAILABLE FOR SDR 26, SDR 35, SCH 40 IPS GASKETED & SOLVENT WELD, N-12, HP STORM, C-900 OR DUCTILE IRON NOTES: · PART NUMBERS WILL VARY BASED ON INLET PIPE MATERIALS. CONTACT STORMTECH FOR MORE INFORMATION. · CONTACT ADS ENGINEERING SERVICES IF INSERTA TEE INLET MUST BE RAISED AS NOT ALL INVERTS ARE POSSIBLE. 6 UNDERDRAIN DETAIL A A B B SECTION A-A SECTION B-B NUMBER AND SIZE OF UNDERDRAINS PER SITE DESIGN ENGINEER 4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS 6" (150 mm) TYP FOR SC-740, DC-780, MC-3500, MC-4500 & MC-7200 SYSTEMS OUTLET MANIFOLD STORMTECH END CAP STORMTECH CHAMBERS STORMTECH CHAMBER STORMTECH END CAP DUAL WALL PERFORATED HDPE UNDERDRAIN ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE FOUNDATION STONE BENEATH CHAMBERS FOUNDATION STONE BENEATH CHAMBERS 5 4" PVC INSPECTION PORT DETAIL (SC SERIES CHAMBER) NOTE: INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST. STORMTECH CHAMBER CONCRETE COLLAR PAVEMENT 12" (300 mm) MIN WIDTH CONCRETE SLAB 6" (150 mm) MIN THICKNESS 8" NYLOPLAST INSPECTION PORT BODY (PART# 2708AG4IPKIT) OR TRAFFIC RATED BOX W/SOLID LOCKING COVER CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 4" (100 mm) SDR 35 PIPE 4" (100 mm) INSERTA TEE TO BE CENTERED ON

Page 10

ECTION PORT BODY (PART# 2708AG4IPKIT) OR TRAFFIC RATED BOX W/SOLID LOCKING COVER CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 4" (100 mm) SDR 35 PIPE 4" (100 mm) INSERTA TEE TO BE CENTERED ON CORRUGATION CREST 4 SC-310 ISOLATOR ROW PLUS DETAIL OPTIONAL INSPECTION PORT SC-310 END CAP COVER ENTIRE ISOLATOR ROW PLUS WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE 5' (1.5 m) MIN WIDE SC-310 CHAMBERSTORMTECH HIGHLY RECOMMENDS FLEXSTORM INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 4' (1.2 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS ELEVATED BYPASS MANIFOLD 12" (300 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE-FABRICATED END CAP WITH FLAMP PART #: SC310EPE12BR SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) NYLOPLAST 3 INSPECTION & MAINTENANCE STEP 1) INSPECT ISOLATOR ROW PLUS FOR SEDIMENT A. INSPECTION PORTS (IF PRESENT) A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B. ALL ISOLATOR PLUS ROWS B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2) CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C. VACUUM STRUCTURE SUMP AS REQUIRED STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN

Page 10

DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. SC-310 CROSS SECTION DETAIL ACCEPTABLE FILL MATERIALS: STORMTECH SC-310 CHAMBER SYSTEMS PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO. 4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4. ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. NOTES: 1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2922 (POLETHYLENE) OR ASTM F2418 (POLYPROPYLENE), "STANDARD SPECIFICATION FOR CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2. SC-310 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5. REQUIREMENTS FOR HANDLING AND INSTALLATION: · TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2922 SHALL BE GREATER