Supporting Documentation · Jul 16, 2024
Drainage Report
49ec4d438ccec1138eb1cca049f5c30de587fe1769e55e2560bd7c9eea462d6cIndexed text · page 120
Show all pagesBasdin 2-2 without Exfiltration Proposed Basin 2-2 R5 NOAA 24-hr D 2-Year Rainfall=3.44" Prepared by Anderson Consulting Services Printed 10/29/2023 HydroCAD® 10.20-3f s/n 06666 © 2023 HydroCAD Software Solutions LLC Page 8 Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 36S: Basin 2-2 Runoff Area=61,497 sf Runoff Depth=2.51" Flow Length=606' Tc=10.0 min CN=80/98 Runoff=3.19 cfs 0.295 af Subcatchment 45S: Basin 2-2 pre-development Runoff Area=62,290 sf Runoff Depth=0.97" Flow Length=130' Tc=13.3 min CN=70/0 Runoff=1.16 cfs 0.116 af Pond 42P: Pond 2-2 Peak Elev=543.40' Storage=9,963 cf Inflow=3.19 cfs 0.295 af Outflow=0.11 cfs 0.099 af Total Runoff Area = 2.842 ac Runoff Volume = 0.411 af Average Runoff Depth = 1.74"
File revisions (1)
- Sep 29, 2026
49ec4d438cce35,736,806 bytes