Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 16, 2024

Drainage Report

Preserved file SHA-25649ec4d438ccec1138eb1cca049f5c30de587fe1769e55e2560bd7c9eea462d6c

Indexed text · page 126

Show all pages
Page 126

Basdin 2-2 without Exfiltration Proposed Basin 2-2 R5 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 10/29/2023 HydroCAD® 10.20-3f s/n 06666 © 2023 HydroCAD Software Solutions LLC Page 14 Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 36S: Basin 2-2 Runoff Area=61,497 sf Runoff Depth=4.17" Flow Length=606' Tc=10.0 min CN=80/98 Runoff=5.27 cfs 0.490 af Subcatchment 45S: Basin 2-2 pre-development Runoff Area=62,290 sf Runoff Depth=2.20" Flow Length=130' Tc=13.3 min CN=70/0 Runoff=2.80 cfs 0.262 af Pond 42P: Pond 2-2 Peak Elev=543.84' Storage=13,078 cf Inflow=5.27 cfs 0.490 af Outflow=0.61 cfs 0.294 af Total Runoff Area = 2.842 ac Runoff Volume = 0.753 af Average Runoff Depth = 3.18"

File revisions (1)