Supporting Documentation · Jul 16, 2024
Drainage Report
49ec4d438ccec1138eb1cca049f5c30de587fe1769e55e2560bd7c9eea462d6cIndexed text · page 156
Show all pagesBasin 2-3 without exfiltration Proposed Basin 2-3 R5 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 10/29/2023 HydroCAD® 10.20-3f s/n 06666 © 2023 HydroCAD Software Solutions LLC Page 19 Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 40S: Basin 2-3 Runoff Area=98,395 sf Runoff Depth=3.92" Flow Length=1,558' Tc=10.5 min CN=79/98 Runoff=7.90 cfs 0.737 af Subcatchment 45S: basin 2-3 pre-development Runoff Area=99,393 sf Runoff Depth=2.20" Flow Length=280' Tc=12.2 min CN=70/0 Runoff=4.62 cfs 0.418 af Pond 44P: pond 2-3 Peak Elev=543.93' Storage=20,108 cf Inflow=7.90 cfs 0.737 af Outflow=0.75 cfs 0.448 af Total Runoff Area = 4.541 ac Runoff Volume = 1.156 af Average Runoff Depth = 3.05"
File revisions (1)
- Sep 29, 2026
49ec4d438cce35,736,806 bytes