Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 16, 2024

Drainage Report

Preserved file SHA-25649ec4d438ccec1138eb1cca049f5c30de587fe1769e55e2560bd7c9eea462d6c

Indexed text · page 167

Show all pages
Page 167

Basin 2-3 without exfiltration Proposed Basin 2-3 R5 NOAA 24-hr D 100-Year Rainfall=8.66" Prepared by Anderson Consulting Services Printed 10/29/2023 HydroCAD® 10.20-3f s/n 06666 © 2023 HydroCAD Software Solutions LLC Page 30 Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 40S: Basin 2-3 Runoff Area=98,395 sf Runoff Depth=7.19" Flow Length=1,558' Tc=10.5 min CN=79/98 Runoff=14.34 cfs 1.353 af Subcatchment 45S: basin 2-3 pre-development Runoff Area=99,393 sf Runoff Depth=5.04" Flow Length=280' Tc=12.2 min CN=70/0 Runoff=10.64 cfs 0.958 af Pond 44P: pond 2-3 Peak Elev=545.17' Storage=32,959 cf Inflow=14.34 cfs 1.353 af Outflow=2.26 cfs 1.063 af Total Runoff Area = 4.541 ac Runoff Volume = 2.311 af Average Runoff Depth = 6.11"

File revisions (1)