Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 16, 2024

Drainage Report

Preserved file SHA-25649ec4d438ccec1138eb1cca049f5c30de587fe1769e55e2560bd7c9eea462d6c

Indexed text · page 344

Show all pages
Page 344

Basin 4 without exfiltration Proposed basin 4 R5 NOAA 24-hr D 2-Year Rainfall=3.44" Prepared by Anderson Consulting Services Printed 10/29/2023 HydroCAD® 10.20-3f s/n 06666 © 2023 HydroCAD Software Solutions LLC Page 8 Time span=0.00-72.00 hrs, dt=0.03 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 16S: Basin 4 Porous pvmt Runoff Area=85,708 sf Runoff Depth=2.64" Flow Length=509' Tc=8.1 min CN=74/98 Runoff=4.96 cfs 0.432 af Subcatchment 18S: OL-4 Runoff Area=11,273 sf Runoff Depth=1.25" Flow Length=96' Slope=0.0573 '/' Tc=8.7 min CN=74/98 Runoff=0.33 cfs 0.027 af Subcatchment 19S: pre-dev basin 4 Runoff Area=96,981 sf Runoff Depth=0.97" Flow Length=190' Tc=15.9 min CN=70/0 Runoff=1.67 cfs 0.180 af Pond 17P: Porous pavement system 4 Peak Elev=589.11' Storage=17,538 cf Inflow=4.96 cfs 0.432 af Outflow=0.08 cfs 0.045 af Total Runoff Area = 4.453 ac Runoff Volume = 0.639 af Average Runoff Depth = 1.72"

File revisions (1)