Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 16, 2024

Drainage Report

Preserved file SHA-25649ec4d438ccec1138eb1cca049f5c30de587fe1769e55e2560bd7c9eea462d6c

Indexed text · page 368

Show all pages
Page 368

Basin 4 without exfiltration Proposed basin 4 R5 NOAA 24-hr D 100-Year Rainfall=8.66" Prepared by Anderson Consulting Services Printed 10/29/2023 HydroCAD® 10.20-3f s/n 06666 © 2023 HydroCAD Software Solutions LLC Page 32 Time span=0.00-72.00 hrs, dt=0.03 hrs, 2401 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 16S: Basin 4 Porous pvmt Runoff Area=85,708 sf Runoff Depth=7.59" Flow Length=509' Tc=8.1 min CN=74/98 Runoff=14.11 cfs 1.245 af Subcatchment 18S: OL-4 Runoff Area=11,273 sf Runoff Depth=5.60" Flow Length=96' Slope=0.0573 '/' Tc=8.7 min CN=74/98 Runoff=1.50 cfs 0.121 af Subcatchment 19S: pre-dev basin 4 Runoff Area=96,981 sf Runoff Depth=5.04" Flow Length=190' Tc=15.9 min CN=70/0 Runoff=9.38 cfs 0.934 af Pond 17P: Porous pavement system 4 Peak Elev=591.49' Storage=27,199 cf Inflow=14.11 cfs 1.245 af Outflow=5.25 cfs 0.858 af Total Runoff Area = 4.453 ac Runoff Volume = 2.300 af Average Runoff Depth = 6.20"

File revisions (1)