Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 16, 2024

Drainage Report

Preserved file SHA-25649ec4d438ccec1138eb1cca049f5c30de587fe1769e55e2560bd7c9eea462d6c

Indexed text · page 63

Show all pages
Page 63

Basin 1 without exfiltration Proposed basin 1 R5 NOAA 24-hr D 10-Year Rainfall=5.22" Prepared by Anderson Consulting Services Printed 10/29/2023 HydroCAD® 10.20-3f s/n 06666 © 2023 HydroCAD Software Solutions LLC Page 21 Time span=0.00-72.00 hrs, dt=0.05 hrs, 1441 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 28S: Basin 1 Runoff Area=314,926 sf Runoff Depth=4.04" Flow Length=1,759' Tc=30.2 min CN=74/98 Runoff=16.45 cfs 2.435 af Subcatchment 32S: Basin 1 Undetained Runoff Area=51,560 sf Runoff Depth=2.54" Flow Length=70' Slope=0.0800 '/' Tc=10.0 min CN=74/0 Runoff=2.97 cfs 0.251 af Subcatchment 36S: Basin 1 Predevelopment Runoff Area=368,926 sf Runoff Depth=2.20" Flow Length=1,360' Tc=31.9 min CN=70/0 Runoff=11.02 cfs 1.553 af Pond 29P: Basin 1 Peak Elev=543.44' Storage=84,135 cf Inflow=16.45 cfs 2.435 af Outflow=0.75 cfs 0.891 af Total Runoff Area = 16.883 ac Runoff Volume = 4.239 af Average Runoff Depth = 3.01"

File revisions (1)