Supporting Documentation · Aug 15, 2024
West Orange Compiled ZBA Application 5 15 24
16bce822b9a6a941d334a663b2d44f2e5949b2d825130a249490af83d36161f6Indexed text · page 56
Show all pagesee WHEREAS, the application was heard at a public meeting of the Board on January 22, 2007; and WHEREAS, the Applicant made its-presentation through David K. Richter, Esq, as their attorney, and submissions included A-1 Site Plan dated August 7, 2006 signed by David C. Coleman, Professional Land Suryeyor: and Ronald J. Tkach, Licensed Professional Engineer, A-2 Lighting Blan dated November 6, 2006; A-3 Landscape plan dated October 2006 by Roy Dunn; A=4 West Orange Load Pocket Diagram; A-5 West Orange Load Pocket Values; A-6 West Orange Voltage for August 2004-2006; A-7 Elevation Views and Details dated August 7, 2006; and WHEREAS, the Applicant presented various witnesses, who included Esam A. F, Khadr, PSE&G’s Manager of Electric Delivery Planning whois an electrical engineer , who was recognized by the Board as such testified that the proposed facilities are required by PJM (Pennsylvania-Jersey-Maryland) Interconnection, L.L.C., a Regional Transmission Organization in order to raise the voltage levels in West Orange and the surrounding areas and to provide safe and reliable electricity to the residents of West Orange; WHEREAS, the applicant presented William T. Walsh, the Project Manager, who testified regarding the construction schedule and the location of the facilities on the Property; WHEREAS, the applicant also presented Mark T. DeVoti, a certified protection professional, certified by ASIS International, PSE&G’s Special Services Manager, who testified to the need for the 8-foot high fence and
File revisions (1)
- Sep 29, 2026
16bce822b9a623,882,504 bytes