Supporting Documentation · Aug 15, 2024
West Orange Compiled ZBA Application 5 15 24
16bce822b9a6a941d334a663b2d44f2e5949b2d825130a249490af83d36161f6Indexed text · page 74
Show all pages5. Has this property been the subject of an application and/or otherwise involved in a matter before the West Orange Planning Board and/or Board of Adjustment? X No __ If yes, please state the dates and action taken or pending, identify the Township Yes __ Agency who or is handling the matter, and enclose a copy of the resolution conserved by the Agency This Application is currently pending before the Zoning Board of Adjustment. Please refer to Attachment ______________________________________________________________________________ F for copies of prior approvals. ______________________________________________________________________________ 6. Has the property received a construction permit and/or is there a construction permit pending? X If yes please state the reason for and the date of application or the date of the Yes__ No __ Issuance of the permit. 7. Describe or attach the landscaping replacement planting plan, if applicable, including the number, size and species of trees to be replaced. Attach additional sheets if necessary. __________________________________________________________________________ Refer to the Landscaping Plan and Notes & Details, Drawing Nos. L-01 and L-02, prepared by PS&S, LLC dated December 22, 2022. __________________________________________________________________________ 8. Describe or attach grading plan if more than six (6) inches of soil will be removed or added within the drip line of a tree or trees on the site: Refer to the Grading & Drainage Plan, Drawing No. 792790, prepared by Burns & McDonnell, dated January ________________________________________________________________________________ 26, 2024. ________________________________________________________________________________ ________________________________________________________________________________ 9. Attach a map, drawing or diagram showing proposed removal locations. List the names, address, phone number and email of the preparer of the map drawing or diagram attached. Refer to the Tree Removal Plan and Notes & Details, Drawing Nos. TR-01, TR-02, and TR-03 prepared by _______________________________________________________________________________ Paulus, Sokolowski and Sartor, LLC (PS&S) dated December 22,
& Details, Drawing Nos. TR-01, TR-02, and TR-03 prepared by _______________________________________________________________________________ Paulus, Sokolowski and Sartor, LLC (PS&S) dated December 22, 2022. ______________________________________________________________________________ ______________________________________________________________________________ 10. List the number, species, and diameter of each tree to be removed: (Attach additional sheets if necessary): Refer to the Tree Removal Plan and Notes & Details, Drawing Nos. TR-01, TR-02, and TR-03, prepared by ______________________________________________________________________________ Paulus, Sokolowski and Sartor, LLC (PS&S) dated December 22, 2022. ______________________________________________________________________________ 11. State reason for removal: Installation of required bioretention basins. ______________________________________________________________________________ 12. Identify the Licensed Tree Expert or Licensed Tree Care Operator who will be providing tree removal services: To Be Determined Contact Name__________________________________________________________________ Business______________________________________________________________________ Address_______________________________________________________________________ City/State/Zip__________________________________________________________________ Work Phone: _______________________________Cell Phone: __________________________ Email: ___________________________ NJTC Business Registration #_____________________
File revisions (1)
- Sep 29, 2026
16bce822b9a623,882,504 bytes