Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
Preserved file SHA-256
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1000
Show all pagesDescription of Stormwater Management Measures Small Scale Bioretention System with Underdrains Design Storms including Adjustment Factors for Current and Future Events: Design Purposes: o Water Quality 1.25 inches in 2 hours o 2-year storm - 3.42 inches o 10-year storm - 5.20 inches o 100-year storm – 8.71 inches o Current 2-year storm – 3.45 inches o Current 10-year storm - 5.36 inches o Current 100-year storm – 9.23 inches o Future 2-year storm – 4.07 inches o Future 10-year storm – 6.34 inches o Future 100-year storm - 11.58 inches March 2024 Stormwater Management Measures Maintenance Plan & Field Manuals Page 4
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes