Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 1003

Show all pages
Page 1003

Inspection and Logs of All Preventative and Corrective Maintenance As per N.J.A.C. 7:8-5.8(f), the person responsible for maintenance shall maintain a detailed log of all preventative and corrective maintenance for the structural stormwater management measures incorporated into the design of the development, including a record of all inspections and copies of all maintenance-related work orders. As per NJDEP BMP Manual Ch. 8 (Feb, 2004), a maintenance plan shall include a schedule of regular inspections and tasks, and detailed logs of all preventative and corrective maintenance performed on the stormwater management measure, including all maintenance-related work orders. The person with maintenance responsibility must retain and, upon request, make available the maintenance plan and associated logs and other records for review by a public entity with administrative, health, environmental, or safety authority over the site. Inspection Checklists in the Field Manual for the stormwater management measures on this site include: - Field Manual for Small-Scale Bioretention Systems with Underdrains The logs of all inspections, and both preventative and corrective maintenance performed should be attached in the “Maintenance Logs and Inspection Records” section. See Part II of the Maintenance Plan March 2024 Stormwater Management Measures Maintenance Plan & Field Manuals Page 7

File revisions (1)