Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1033
Show all pagesInspection Checklist / Maintenance Actions Bioretention System Checklist (circle one): Quarterly / Annual / Monthly / Special Event Inspection Checklist No. ______________ Inspection Date: _______________ Date of most recent rain event: __________ Rain Condition (circle one): Drizzle / Shower / Downpour / Other _____________ Ground Condition (circle one): Dry / Moist / Ponding / Submerged / Snow accumulation The inspection items and preventative/corrective maintenance actions listed below represent general requirements. The design engineer and/or responsible party shall adjust the items and actions to better meet the conditions of the site, the specific design targets, and the requirements of regulatory authorities. April 2015 Bioretention System Page 37/49
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes