Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 1033

Show all pages
Page 1033

Inspection Checklist / Maintenance Actions Bioretention System Checklist (circle one): Quarterly / Annual / Monthly / Special Event Inspection Checklist No. ______________ Inspection Date: _______________ Date of most recent rain event: __________ Rain Condition (circle one): Drizzle / Shower / Downpour / Other _____________ Ground Condition (circle one): Dry / Moist / Ponding / Submerged / Snow accumulation The inspection items and preventative/corrective maintenance actions listed below represent general requirements. The design engineer and/or responsible party shall adjust the items and actions to better meet the conditions of the site, the specific design targets, and the requirements of regulatory authorities. April 2015 Bioretention System Page 37/49

File revisions (1)