J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1034
Show all pagesFor Inspector Component No. Component Name Inspection Item and Inspection Item No. 1 Scouring or erosion is present at inlet structure and/or riprap apron For Maintenance Crew Result Y__ Preventative / Corrective Maintenance Actions Check the flow diversion device before the inlet pipe and whether the bypass flow channel is clogged N__ Work Order # __________ A1 Pretreatment (Forebay) 2 3 A2 Pretreatment (MTD) A3 Pretreatment (Structural BMP) 1 Clogged pipes or excessive sediment in the forebay Damaged outlet structure (e.g., cracking, subsidence, spalling, erosion, or deterioration) Y__ Remove sediment or debris N__ Y__ Repair or replace the outlet structure N__ Work Order # __________ Y__ (If a MTD is used for pretreatment, see Maintenance Manual Provided by the manufacturer) MTD inspection (if installed) N__ Y__ 1 BMP inspection (See BMP No. ________ Field Manual) N__ Note: April 2015 Bioretention System Page 38/49
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes