Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Aug 15, 2024

J_2024 05 09_West Orange Stormwater Management Plan

Preserved file SHA-256c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5e

Indexed text · page 1035

Show all pages
Page 1035

For Inspector Component No. Component Name Inspection Item and Inspection Item No. For Maintenance Crew Result Preventative / Corrective Maintenance Actions Recheck to determine if there is standing water after 72 hours If standing water is present longer than 5 days, report to mosquito commission. Standing water is present after the design drain time 1 The observed drain time is approximately _________ hours. Y__ N__ Remove any sediment buildup Check the soil permeability Till the soil bed with rotary tiller or disc harrow Replace the planting soil, if necessary B Basin Bed Work Order # ______________ 2 3 Excessive sediment, silt, or trash accumulation on basin bed Erosion or channelization is present Y__ Clean pretreatment system N__ Remove silt, sediment, and trash Y__ N__ Check whether the flow bypass or diversion device is clogged Re-grade the infiltration bed Work Order # ______________ 4 Y__ Pest control N__ Work Order # __________ Bioretention System Page 39/49 Animal burrows/rodents are present Note: April 2015

File revisions (1)