Supporting Documentation · Aug 15, 2024
J_2024 05 09_West Orange Stormwater Management Plan
c30154c5b2e926fb3bf094c58f5df7b46c6e758698d66ce7ef1e45733c103a5eIndexed text · page 1036
Show all pagesFor Inspector Component No. Component Name Inspection Item and Inspection Item No. For Maintenance Crew Result Y__ 5 Uneven bed N__ B Basin Bed 6 7 Evidence of sinkholes or subsidence Pop-up Drainage Emitters and perforated drainage pipes Use light equipment to resurface the bed Work Order # _________ Y__ Monitor for sinkhole development N__ Y__ N__ Y__ 1 Preventative / Corrective Maintenance Actions Large spot(s) showing bare soil N__ Open Pop-up drainage emitters and inspect for blockages, remove blockages if found Vegetative cover must be maintained at 85%. Revegetate the entire basin if 50% or more vegetation has been lost. Check Landscaping plan for guidance (if available) Work Order # __________ C Vegetation Y__ 2 Invasive plants are present N__ Remove the invasive plants and restore the vegetation in accordance with the landscaping plan Work Order # __________ Revegetate the system in accordance with the vegetation plan 3 The vegetation in the basin has been mowed or removed April 2015 Y__ N__ Bioretention System Work Order # __________ Note: The vegetation in a bioretention system should not be mowed or removed Page 40/49
File revisions (1)
- Sep 29, 2026
c30154c5b2e9131,201,955 bytes